Diseño y construcción del Nuevo Puente de Espartxo sobre el río Urumea, San Sebastián

IF 0.4 Q4 ENGINEERING, CIVIL
G. Miguel, María Rosario García Pérez, Miguel Sacristán Montesinos, J. S. D. Vega, Alejandro Godoy Ansótegui
{"title":"Diseño y construcción del Nuevo Puente de Espartxo sobre el río Urumea, San Sebastián","authors":"G. Miguel, María Rosario García Pérez, Miguel Sacristán Montesinos, J. S. D. Vega, Alejandro Godoy Ansótegui","doi":"10.33586/HYA.2020.2838","DOIUrl":null,"url":null,"abstract":"The new Espartxo Bridge, currently under its final stages of construction, will substitute the deteriorated Espartxo Zubia, just 6.60 m wide and with low clearance (6 m) which could cause hydraulic problems in case of flood. The construction of the bridge forms part of the LM.06 Txomin-Enea new urban development, promoted by San Sebastian City Council, whose objective is modernizing and providing new uses to this area. It is a necessary work because the existing bridge does not meet the needs in terms of useful width to support the roadway, sidewalks and bike path, and its geometry is not compatible with the new development nor the riverside park that will follow the left bank of the River Urumea. PALABRAS CLAVE: puente urbano, pila singular, metálica, Espartxo, Txomin-Enea, San Sebastián.","PeriodicalId":41423,"journal":{"name":"Hormigon y Acero","volume":" ","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2020-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hormigon y Acero","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33586/HYA.2020.2838","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

The new Espartxo Bridge, currently under its final stages of construction, will substitute the deteriorated Espartxo Zubia, just 6.60 m wide and with low clearance (6 m) which could cause hydraulic problems in case of flood. The construction of the bridge forms part of the LM.06 Txomin-Enea new urban development, promoted by San Sebastian City Council, whose objective is modernizing and providing new uses to this area. It is a necessary work because the existing bridge does not meet the needs in terms of useful width to support the roadway, sidewalks and bike path, and its geometry is not compatible with the new development nor the riverside park that will follow the left bank of the River Urumea. PALABRAS CLAVE: puente urbano, pila singular, metálica, Espartxo, Txomin-Enea, San Sebastián.
设计和建造新的Espartxo桥在Urumea河,San sebastian
新的Espartxo大桥目前正处于最后的建设阶段,它将取代已经老化的Espartxo Zubia大桥,它的宽度只有6.60米,间隙很小(6米),在洪水发生时可能会导致水力问题。这座桥的建设是LM.06 Txomin-Enea新城市发展的一部分,由圣塞巴斯蒂安市议会推动,其目标是现代化并为该地区提供新的用途。这是一项必要的工作,因为现有的桥梁在支撑道路、人行道和自行车道的有用宽度方面不能满足需求,而且它的几何形状与新的开发项目和沿着乌鲁米奥河左岸的河边公园不兼容。PALABRAS CLAVE: puente urbano, pila singular, metálica, Espartxo, Txomin-Enea, San Sebastián。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Hormigon y Acero
Hormigon y Acero ENGINEERING, CIVIL-
CiteScore
0.50
自引率
0.00%
发文量
4
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信