{"title":"RENCANA PRODUKSI OLAHAN KOPI DI PERUSAHAAN DAERAH PERKEBUNAN (PDP) KAHYANGAN JEMBER MENGGUNAKAN METODE FUZZY TSUKAMOTO","authors":"Yuli Wibowo, Yeyen Retno Maulida, B. Purnomo","doi":"10.21107/AGROINTEK.V13I1.4875","DOIUrl":null,"url":null,"abstract":"PDP Kahyangan Jember is a regional company owned by the Government of Jember Regency that has agroindustry ground coffee and roasted coffee. The problem is that there was a mismatch between the company's production plan and the number of consumer demand that cause the stock. The impact is that production costs will increase because of the cost of storing and the production process becomes disrupted due to the location of the product storage warehouse in place together with the production space. The purpose of this research is to evaluate and to make a production plan model at PDP Kahyangan Jember. The method used is fuzzy Tsukamoto with input variables in the form of consumer demand and stock. The results showed that the prediction of the quantity of ground coffee and roasted coffee in the past year (July 2017-June 2018) resulted in a MAPE value of 16%. The MAPE value obtained is \"good\" because it was in between 10-20%. The results of the fuzzy Tsukamoto model simulation for future production plans are done by predicting the number of requests in advance using the DES Brown method and the stock using the SES method. The forecasting results for the number of requests for coffee were 3,304 kg, 3,261 kg, 3,219 kg, 3,176 kg, 3,134 kg, and 3,091 kg. While the stock forecasting results are 283 kg, 205 kg, 173 kg, 151 kg, 140 kg, and 134 kg. Therefore, the production plan of coffee processed using fuzzy Tsukamoto for July - December 2018 are 4144 kg, 4136 kg, 4130 kg, 4121 kg, 4110 kg and 4095 kg respectively.","PeriodicalId":31775,"journal":{"name":"Agrointek","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Agrointek","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21107/AGROINTEK.V13I1.4875","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

PDP Kahyangan Jember is a regional company owned by the Government of Jember Regency that has agroindustry ground coffee and roasted coffee. The problem is that there was a mismatch between the company's production plan and the number of consumer demand that cause the stock. The impact is that production costs will increase because of the cost of storing and the production process becomes disrupted due to the location of the product storage warehouse in place together with the production space. The purpose of this research is to evaluate and to make a production plan model at PDP Kahyangan Jember. The method used is fuzzy Tsukamoto with input variables in the form of consumer demand and stock. The results showed that the prediction of the quantity of ground coffee and roasted coffee in the past year (July 2017-June 2018) resulted in a MAPE value of 16%. The MAPE value obtained is "good" because it was in between 10-20%. The results of the fuzzy Tsukamoto model simulation for future production plans are done by predicting the number of requests in advance using the DES Brown method and the stock using the SES method. The forecasting results for the number of requests for coffee were 3,304 kg, 3,261 kg, 3,219 kg, 3,176 kg, 3,134 kg, and 3,091 kg. While the stock forecasting results are 283 kg, 205 kg, 173 kg, 151 kg, 140 kg, and 134 kg. Therefore, the production plan of coffee processed using fuzzy Tsukamoto for July - December 2018 are 4144 kg, 4136 kg, 4130 kg, 4121 kg, 4110 kg and 4095 kg respectively.
种植园集团(PDP) KAHYANGAN JEMBER采用了模糊的TSUKAMOTO方法
PDP Kahyangan Jember是Jember摄政政府拥有的一家地区性公司,主要生产农业磨粉咖啡和烘焙咖啡。问题是公司的生产计划和导致库存的消费者需求数量不匹配。其影响是,由于存储成本的增加,生产成本将增加,并且由于产品存储仓库的位置与生产空间一起,生产过程将中断。本研究的目的是评价和制定卡海扬甘山PDP的生产计划模型。该方法采用模糊冢本模型,输入变量为消费者需求和库存。结果表明,对过去一年(2017年7月至2018年6月)磨碎咖啡和烘焙咖啡数量的预测导致MAPE值为16%。获得的MAPE值是“良好”的,因为它在10-20%之间。采用DES Brown法和SES法分别对未来生产计划的需求数量和库存进行了预测,得到了模糊冢本模型的仿真结果。咖啡需求量预测结果分别为3304公斤、3261公斤、3219公斤、3176公斤、3134公斤、3091公斤。库存量预测结果分别为283公斤、205公斤、173公斤、151公斤、140公斤和134公斤。因此,2018年7 - 12月使用模糊冢本加工的咖啡生产计划分别为4144公斤、4136公斤、4130公斤、4121公斤、4110公斤和4095公斤。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
50
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信