Risk-based stochastic scheduling of centralised and distributed energy storage systems

IF 2.4 Q2 ENGINEERING, ELECTRICAL & ELECTRONIC
IET Smart Grid Pub Date : 2023-09-07 DOI:10.1049/stg2.12125
Majid Majidi, Masood Parvania, Raymond Byrne
{"title":"Risk-based stochastic scheduling of centralised and distributed energy storage systems","authors":"Majid Majidi,&nbsp;Masood Parvania,&nbsp;Raymond Byrne","doi":"10.1049/stg2.12125","DOIUrl":null,"url":null,"abstract":"<p>The authors propose a continuous-time two-stage stochastic optimisation model for the integration of centralised and distributed energy storage (ES) systems into power systems with high levels of volatile renewable generation. In the proposed model, centralised and distributed ES systems, respectively, controlled by the independent system operator and distribution system operator, can offer energy and flexibility to the operation of the power system in order to help accommodate the uncertainties of renewable generation and load. The proposed model considers the power network constraints and minimises the day-ahead and real-time operation costs of the system in the first and second stages. The proposed model utilises energy and ramping flexibility trajectories of ES systems to enhance the cost-effective operation of the power system, countering the financial risks imposed by the integration of uncertain load and renewable generation. Simulations are conducted on the IEEE 24-bus reliability test system with multiple risk-aversion levels for the power system operator, and the results demonstrate the efficiency of the proposed model in utilising the ES systems to provide energy and ramping flexibility and reducing the financial risks measured by the conditional value at risk.</p>","PeriodicalId":36490,"journal":{"name":"IET Smart Grid","volume":null,"pages":null},"PeriodicalIF":2.4000,"publicationDate":"2023-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ietresearch.onlinelibrary.wiley.com/doi/epdf/10.1049/stg2.12125","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IET Smart Grid","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/stg2.12125","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

The authors propose a continuous-time two-stage stochastic optimisation model for the integration of centralised and distributed energy storage (ES) systems into power systems with high levels of volatile renewable generation. In the proposed model, centralised and distributed ES systems, respectively, controlled by the independent system operator and distribution system operator, can offer energy and flexibility to the operation of the power system in order to help accommodate the uncertainties of renewable generation and load. The proposed model considers the power network constraints and minimises the day-ahead and real-time operation costs of the system in the first and second stages. The proposed model utilises energy and ramping flexibility trajectories of ES systems to enhance the cost-effective operation of the power system, countering the financial risks imposed by the integration of uncertain load and renewable generation. Simulations are conducted on the IEEE 24-bus reliability test system with multiple risk-aversion levels for the power system operator, and the results demonstrate the efficiency of the proposed model in utilising the ES systems to provide energy and ramping flexibility and reducing the financial risks measured by the conditional value at risk.

Abstract Image

基于风险的集中式和分布式储能系统随机调度
作者提出了一个连续时间两阶段随机优化模型,用于将集中式和分布式储能系统集成到具有高波动可再生能源发电水平的电力系统中。在所提出的模型中,分别由独立系统运营商和配电系统运营商控制的集中式和分布式ES系统可以为电力系统的运行提供能量和灵活性,以帮助适应可再生能源发电和负载的不确定性。所提出的模型考虑了电网约束,并在第一和第二阶段将系统的日前和实时运行成本降至最低。所提出的模型利用ES系统的能源和爬坡灵活性轨迹来提高电力系统的成本效益运行,对抗不确定负荷和可再生能源发电一体化带来的财务风险。对电力系统运营商具有多个风险规避级别的IEEE 24总线可靠性测试系统进行了仿真,结果证明了所提出的模型在利用ES系统提供能量和斜坡灵活性以及降低由风险条件值衡量的财务风险方面的效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
IET Smart Grid
IET Smart Grid Computer Science-Computer Networks and Communications
CiteScore
6.70
自引率
4.30%
发文量
41
审稿时长
29 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信