Streamlining the management of payment delays: the case of Sri Lankan Government building construction projects

IF 1.2 Q3 BUSINESS, FINANCE
B. Perera, K. G. Dewagoda
{"title":"Streamlining the management of payment delays: the case of Sri Lankan Government building construction projects","authors":"B. Perera, K. G. Dewagoda","doi":"10.1108/JFMPC-05-2020-0041","DOIUrl":null,"url":null,"abstract":"\nPurpose\nDelayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of delayed payments must be identified before implementing strategies to mitigate the consequences of such delayed payments. However, these causes and consequences and the parties responsible for managing the delayed payments have not been identified so far. Therefore, the purpose of this study is to investigate the management of payment delays in Government-funded construction projects.\n\n\nDesign/methodology/approach\nThe study used a mixed approach comprising four case studies and a questionnaire survey. The empirical data collected from the case studies and the questionnaire survey were analysed using manual content analysis and mean rating, respectively.\n\n\nFindings\nThe study identified the most significant causes and the most significant consequences of delayed payments that occur in Government-funded construction projects. It also revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments.\n\n\nOriginality/value\nThis study identified the most significant causes of delayed payments in Government-funded construction projects, the most significant consequences of such delayed payments and the most suitable strategies the clients, consultants and contractors can adopt to mitigate the consequences of such delayed payments. Thus, this study supports streamlining the management of payment delays in Government construction projects and identifies the roles that different parties must play in managing payment delays in Government building projects, which is an under-researched area.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-05-2020-0041","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 7

Abstract

Purpose Delayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of delayed payments must be identified before implementing strategies to mitigate the consequences of such delayed payments. However, these causes and consequences and the parties responsible for managing the delayed payments have not been identified so far. Therefore, the purpose of this study is to investigate the management of payment delays in Government-funded construction projects. Design/methodology/approach The study used a mixed approach comprising four case studies and a questionnaire survey. The empirical data collected from the case studies and the questionnaire survey were analysed using manual content analysis and mean rating, respectively. Findings The study identified the most significant causes and the most significant consequences of delayed payments that occur in Government-funded construction projects. It also revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments. Originality/value This study identified the most significant causes of delayed payments in Government-funded construction projects, the most significant consequences of such delayed payments and the most suitable strategies the clients, consultants and contractors can adopt to mitigate the consequences of such delayed payments. Thus, this study supports streamlining the management of payment delays in Government construction projects and identifies the roles that different parties must play in managing payment delays in Government building projects, which is an under-researched area.
简化付款延误的管理:以斯里兰卡政府大楼建设项目为例
在建设项目中,特别是在政府资助的建设项目中,延迟付款是一个长期存在的紧迫问题。在实施减轻这种延迟付款后果的战略之前,必须查明延迟付款的根本原因和后果。然而,这些原因和后果以及负责管理延迟付款的各方迄今尚未查明。因此,本研究的目的是探讨政府资助建设项目的付款延迟管理。设计/方法/方法本研究采用混合方法,包括四个案例研究和问卷调查。案例研究和问卷调查收集的实证数据分别采用手工内容分析法和平均评分法进行分析。研究发现,在政府资助的建设项目中,延迟付款的最重要原因和最重要的后果。它还揭示了客户、顾问、承包商和其他各方可以采取的策略,以减轻这种延迟付款的不利后果。原创性/价值本研究确定了政府资助建设项目中延迟付款的最重要原因,这种延迟付款的最重要后果以及客户,顾问和承包商可以采取的最合适的策略来减轻这种延迟付款的后果。因此,本研究支持简化政府建设项目付款延迟的管理,并确定不同各方在管理政府建筑项目付款延迟中必须发挥的作用,这是一个研究不足的领域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信