Opportunity of Implementing Buy the Service (BTS) Subsidies for Bus Rapid Transit (BRT) to Improve the Quality of Public Transport Services in Padang Panjang City

V. Masbiran, Elsa Yolarita, Syapta Wiguna, Tania Andari, Afriyanni Afriyanni, Momon Momon
{"title":"Opportunity of Implementing Buy the Service (BTS) Subsidies for Bus Rapid Transit (BRT) to Improve the Quality of Public Transport Services in Padang Panjang City","authors":"V. Masbiran, Elsa Yolarita, Syapta Wiguna, Tania Andari, Afriyanni Afriyanni, Momon Momon","doi":"10.21787/jbp.14.2022.479-492","DOIUrl":null,"url":null,"abstract":"This study aims to analyze the cost of subsidies and the opportunity to implement Buy the Service (BTS) for Bus Rapid Transit (BRT) in Padang Panjang City. This study uses a quantitative method with a descriptive approach. Primary data collection includes observation and distribution questionnaires with respondents using public and non-public transport users. The information obtained from the distribution of questionnaires is the origin of the destination, characteristics of public transportation behavior, and the willingness to pay of the community towards public transportation modes that follow public transportation service standards. The operational costs of public vehicles are obtained from the survey results of the basic costs of public transportation, which consist of direct and indirect costs. The results of this study formulate 3 (three) main route trajectories scenarios and cost analysis of BTS implementation that meets Minimum Service Standards (SPM). The estimated subsidy cost for implementing BTS in the three main corridors is 10.09 billion, with the highest subsidy cost being in corridor 1. which is 4.41 billion but has a smaller headway than the other two corridors. The results of this study also recommend the need for continuous socialization to the community regarding the ease and convenience of using BRT as well as equalizing perceptions between local governments and operators regarding the mechanism for providing BRT subsidies.","PeriodicalId":52606,"journal":{"name":"Jurnal Bina Praja","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Bina Praja","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21787/jbp.14.2022.479-492","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to analyze the cost of subsidies and the opportunity to implement Buy the Service (BTS) for Bus Rapid Transit (BRT) in Padang Panjang City. This study uses a quantitative method with a descriptive approach. Primary data collection includes observation and distribution questionnaires with respondents using public and non-public transport users. The information obtained from the distribution of questionnaires is the origin of the destination, characteristics of public transportation behavior, and the willingness to pay of the community towards public transportation modes that follow public transportation service standards. The operational costs of public vehicles are obtained from the survey results of the basic costs of public transportation, which consist of direct and indirect costs. The results of this study formulate 3 (three) main route trajectories scenarios and cost analysis of BTS implementation that meets Minimum Service Standards (SPM). The estimated subsidy cost for implementing BTS in the three main corridors is 10.09 billion, with the highest subsidy cost being in corridor 1. which is 4.41 billion but has a smaller headway than the other two corridors. The results of this study also recommend the need for continuous socialization to the community regarding the ease and convenience of using BRT as well as equalizing perceptions between local governments and operators regarding the mechanism for providing BRT subsidies.
实施快速公交购买服务补贴提高巴东市公共交通服务质量的机遇
本研究旨在分析巴东市快速公交(BRT)的补贴成本和实施购买服务(BTS)的机会。本研究采用了定量方法和描述性方法。主要数据收集包括对使用公共和非公共交通用户的受访者进行观察和分发问卷。通过发放问卷获得的信息是目的地的来源、公共交通行为的特征以及社区对遵循公共交通服务标准的公共交通方式的支付意愿。公共车辆运营成本是根据公共交通基本成本调查结果得出的,包括直接成本和间接成本。本研究的结果制定了符合最低服务标准(SPM)的BTS实施的3(三)个主要路线轨迹场景和成本分析。在三条主要走廊实施BTS的补贴成本估计为100.9亿,其中1号走廊的补贴成本最高。这一数字为44.1亿,但与其他两条走廊相比进展较小。本研究的结果还建议,在使用快速公交的方便性方面,需要向社区持续进行社会化,并在地方政府和运营商之间就快速公交补贴机制达成共识。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
26
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信