Identification of risk factors leading to cost and time overrun in B-O-T projects

A. M. Mathew, Neena S Lal
{"title":"Identification of risk factors leading to cost and time overrun in B-O-T projects","authors":"A. M. Mathew, Neena S Lal","doi":"10.7770/safer-v10n1-art2466","DOIUrl":null,"url":null,"abstract":"As infrastructural investments are vital in developing countries, it’ll not solely facilitate to foster the economic growth of a nation, however it’ll additionally act as a platform within which new kinds of partnership and collaboration may be developed. The developments of BOT have attracted participation of native and foreign non-public sector capitalist to secure funding and to deliver projects on time, within the budget and to the desired specifications. There are many complexities in projects because of the variety of factors in project’s trend and also the dependence of project primarily on national factors. Because of these complexities and their long-term operation, the projects meet with uncertainty and numerous risks. Effective risk management methods and good managerial skills are required in guaranteeing the success of the project. In recent years, due to substantial increase in the amount of construction companies along with the changes in the government administrations, the construction projects are exposed to cost and time overrun and has huge impact on the progress of works within the industry. Although, the sector is considered to be a key driver of economic growth, time and cost overruns threaten to limit the sector’s potential to help achieve the desired growth and ensure efficient capital expenditure. \nKeywords—BOT, cost overrun, delays, risk","PeriodicalId":30590,"journal":{"name":"Sustainability Agri Food and Environmental Research","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-03-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainability Agri Food and Environmental Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7770/safer-v10n1-art2466","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As infrastructural investments are vital in developing countries, it’ll not solely facilitate to foster the economic growth of a nation, however it’ll additionally act as a platform within which new kinds of partnership and collaboration may be developed. The developments of BOT have attracted participation of native and foreign non-public sector capitalist to secure funding and to deliver projects on time, within the budget and to the desired specifications. There are many complexities in projects because of the variety of factors in project’s trend and also the dependence of project primarily on national factors. Because of these complexities and their long-term operation, the projects meet with uncertainty and numerous risks. Effective risk management methods and good managerial skills are required in guaranteeing the success of the project. In recent years, due to substantial increase in the amount of construction companies along with the changes in the government administrations, the construction projects are exposed to cost and time overrun and has huge impact on the progress of works within the industry. Although, the sector is considered to be a key driver of economic growth, time and cost overruns threaten to limit the sector’s potential to help achieve the desired growth and ensure efficient capital expenditure. Keywords—BOT, cost overrun, delays, risk
确定在B-O-T项目中导致成本和时间超支的风险因素
由于基础设施投资对发展中国家至关重要,它不仅有助于促进一个国家的经济增长,而且还将成为发展新型伙伴关系和合作的平台。BOT的发展吸引了国内外非公共部门资本家的参与,以确保资金,并在预算范围内按时交付符合要求的项目。由于项目趋势中因素的多样性,以及项目主要依赖于国家因素,项目中存在许多复杂性。由于这些复杂性及其长期运营,这些项目面临着不确定性和众多风险。为了保证项目的成功,需要有效的风险管理方法和良好的管理技能。近年来,由于建筑公司数量的大幅增加以及政府管理的变化,建筑项目面临成本和时间超支的风险,并对行业内的工程进度产生了巨大影响。尽管该行业被认为是经济增长的关键驱动力,但时间和成本超支可能会限制该行业帮助实现预期增长和确保有效资本支出的潜力。关键词——BOT、成本超支、延误、风险
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
5
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信