{"title":"Reliable introduction of critical assets: an explorative case study in railways","authors":"Jan-jaap Moerman, J. Braaksma, L. V. van Dongen","doi":"10.1108/JQME-05-2020-0037","DOIUrl":null,"url":null,"abstract":"Asset-intensive organizations rely heavily on physical assets that are often expensive, complex and have a significant impact on organizational performance. Past introductions of critical assets in various industries showed that despite many preparations in maintenance and operations, shortcomings were identified after deployment resulting in unreliable performance. The main purpose of this qualitative study is to explore the factors that determine how asset-intensive organizations can achieve reliable outcomes in critical asset introductions despite random failures as a result of increasing complexity and infant mortalities.,To gain a detailed understanding of the issues and challenges of critical asset introductions, a case study in railways (rolling stock introductions) was conducted and analyzed using qualitative analysis.,The case showed that organizational factors were perceived as decisive factors for a reliable performance of the introduction, while the main focus of the introduction was on the asset and its technical systems. This suggests that more consideration toward organizational factors is needed. Therefore, a critical asset introduction framework was proposed based on 15 identified factors.,Reliable performance is often associated with technical systems only. This empirical study emphasizes the need for a more holistic perspective and the inclusion of organizational factors when introducing critical assets seeking reliable performance. This study demonstrated the application of the affinity diagramming technique in collectively analyzing the data adopting a multidisciplinary orientation.","PeriodicalId":16938,"journal":{"name":"Journal of Quality in Maintenance Engineering","volume":"1 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2021-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Quality in Maintenance Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JQME-05-2020-0037","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Asset-intensive organizations rely heavily on physical assets that are often expensive, complex and have a significant impact on organizational performance. Past introductions of critical assets in various industries showed that despite many preparations in maintenance and operations, shortcomings were identified after deployment resulting in unreliable performance. The main purpose of this qualitative study is to explore the factors that determine how asset-intensive organizations can achieve reliable outcomes in critical asset introductions despite random failures as a result of increasing complexity and infant mortalities.,To gain a detailed understanding of the issues and challenges of critical asset introductions, a case study in railways (rolling stock introductions) was conducted and analyzed using qualitative analysis.,The case showed that organizational factors were perceived as decisive factors for a reliable performance of the introduction, while the main focus of the introduction was on the asset and its technical systems. This suggests that more consideration toward organizational factors is needed. Therefore, a critical asset introduction framework was proposed based on 15 identified factors.,Reliable performance is often associated with technical systems only. This empirical study emphasizes the need for a more holistic perspective and the inclusion of organizational factors when introducing critical assets seeking reliable performance. This study demonstrated the application of the affinity diagramming technique in collectively analyzing the data adopting a multidisciplinary orientation.
关键资产的可靠引入:铁路的探索性案例研究
资产密集型组织严重依赖于通常昂贵、复杂且对组织绩效有重大影响的实物资产。过去在各个行业中引入的关键资产表明,尽管在维护和操作方面做了许多准备,但在部署后发现了导致性能不可靠的缺点。本定性研究的主要目的是探索决定资产密集型组织如何在关键资产引入中获得可靠结果的因素,尽管由于复杂性和婴儿死亡率的增加而导致随机失败。为了详细了解关键资产引入的问题和挑战,本文对铁路(机车车辆引入)进行了案例研究,并使用定性分析进行了分析。该案例表明,组织因素被认为是引进的可靠表现的决定性因素,而引进的主要重点是资产及其技术系统。这表明需要更多地考虑组织因素。因此,提出了一个基于15个确定因素的关键资产引入框架。可靠的性能通常只与技术系统有关。本实证研究强调,在引入寻求可靠绩效的关键资产时,需要更全面的视角和包含组织因素。本研究以多学科为导向,展示了亲和图技术在数据集体分析中的应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Quality in Maintenance Engineering
Journal of Quality in Maintenance Engineering Engineering-Safety, Risk, Reliability and Quality
CiteScore
4.00
自引率
13.30%
发文量
24
期刊介绍: This exciting journal looks at maintenance engineering from a positive standpoint, and clarifies its recently elevatedstatus as a highly technical, scientific, and complex field. Typical areas examined include: ■Budget and control ■Equipment management ■Maintenance information systems ■Process capability and maintenance ■Process monitoring techniques ■Reliability-based maintenance ■Replacement and life cycle costs ■TQM and maintenance
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信