Project Schedule Expediting under Structural and Parametric Uncertainty

IF 1.9 4区 管理学 Q3 ENGINEERING, INDUSTRIAL
V. Nazimko, L. Zakharova
{"title":"Project Schedule Expediting under Structural and Parametric Uncertainty","authors":"V. Nazimko, L. Zakharova","doi":"10.1080/10429247.2022.2030179","DOIUrl":null,"url":null,"abstract":"Abstract Project expediting is an important tool, which helps to prevent risks of losses following the project schedule tardiness. We developed an algorithm of iterative crashing (AIC), which not only involved traditional time/cost/resource parameters but also accounted for the structure of a project schedule, the number of critical paths (CP), their probabilities, and the probability of activities. Two auxiliary indexes were constructed to select the critical activity and control the process of schedule expediting. AIC was tested on five previously optimized benchmark schedules. Multiplying CPs and leveling their probabilities can reduce bias up to 23% and are capable of improving these benchmarks schedules by at least 6%.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"35 1","pages":"29 - 49"},"PeriodicalIF":1.9000,"publicationDate":"2022-02-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/10429247.2022.2030179","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract Project expediting is an important tool, which helps to prevent risks of losses following the project schedule tardiness. We developed an algorithm of iterative crashing (AIC), which not only involved traditional time/cost/resource parameters but also accounted for the structure of a project schedule, the number of critical paths (CP), their probabilities, and the probability of activities. Two auxiliary indexes were constructed to select the critical activity and control the process of schedule expediting. AIC was tested on five previously optimized benchmark schedules. Multiplying CPs and leveling their probabilities can reduce bias up to 23% and are capable of improving these benchmarks schedules by at least 6%.
结构和参数不确定性下的项目进度催交
项目加速是一种重要的工具,它有助于防止项目进度延迟带来的损失风险。我们开发了一种迭代崩溃(AIC)算法,它不仅涉及传统的时间/成本/资源参数,而且还考虑了项目进度的结构、关键路径(CP)的数量、它们的概率和活动的概率。构建了两个辅助指标来选择关键作业并控制进度加快过程。AIC在五个先前优化的基准测试计划上进行了测试。将cp相乘并调整其概率可以减少高达23%的偏差,并能够将这些基准测试时间表提高至少6%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Engineering Management Journal
Engineering Management Journal 工程技术-工程:工业
CiteScore
5.60
自引率
12.00%
发文量
27
审稿时长
>12 weeks
期刊介绍: EMJ is designed to provide practical, pertinent knowledge on the management of technology, technical professionals, and technical organizations. EMJ strives to provide value to the practice of engineering management and engineering managers. EMJ is an archival journal that facilitates both practitioners and university faculty in publishing useful articles. The primary focus is on articles that improve the practice of engineering management. To support the practice of engineering management, EMJ publishes papers within key engineering management content areas. EMJ Editors will continue to refine these areas to ensure they are aligned with the challenges faced by technical organizations and technical managers.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信