Deployment potential and economic cost analysis of CCUS in high-emission industries: A case study of Liaoning Province, China

IF 5.9 3区 工程技术 Q2 ENERGY & FUELS
Huan You, Jinguang Yan, Jingyao Jia, Chengkang Gao, Guoqiang Sang, Jiutian Zhang, Ciang Ding, Ying Zhang
{"title":"Deployment potential and economic cost analysis of CCUS in high-emission industries: A case study of Liaoning Province, China","authors":"Huan You,&nbsp;Jinguang Yan,&nbsp;Jingyao Jia,&nbsp;Chengkang Gao,&nbsp;Guoqiang Sang,&nbsp;Jiutian Zhang,&nbsp;Ciang Ding,&nbsp;Ying Zhang","doi":"10.1016/j.ijggc.2026.104800","DOIUrl":null,"url":null,"abstract":"<div><div>Achieving China’s dual-carbon goals requires accelerated CCUS deployment, yet provinces with concentrated emissions and limited site-level storage remain understudied. This study developed a plant-level source-sink database for Liaoning Province and applied a MILP model enhanced with DBSCAN to assess mitigation potential, costs, and matching strategies. Annual CO₂ emissions from coal power, steel, and cement plants reached 112.43, 141.32, and 22.04 Mt. Storage capacity in oil fields and saline aquifers totaled 25.69 Gt. However, most oil fields cannot independently meet sequestration needs. Within 250 km, 13 cement plants could be matched, achieving 9.09 Mt CO₂ mitigation demand at –42.24 $/t. Clustering oil fields into three groups increased cement-sector mitigation to 10.32 Mt and lowered costs to –87.88 $/t, although this configuration did not support matches for steel plants or coal-fired power plants. This is a planning-oriented screening and matching study conducted under specific assumptions: a 250 km transport distance limit, a project start year of 2030, and a 30-year operational lifetime, rather than a full dynamic deployment pathway analysis. This study offers a theoretical foundation and pathway reference for other industrial provinces under storage-constrained conditions.</div></div>","PeriodicalId":334,"journal":{"name":"International Journal of Greenhouse Gas Control","volume":"156 ","pages":"Article 104800"},"PeriodicalIF":5.9000,"publicationDate":"2026-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Greenhouse Gas Control","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S175058362600232X","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/10/3 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

Achieving China’s dual-carbon goals requires accelerated CCUS deployment, yet provinces with concentrated emissions and limited site-level storage remain understudied. This study developed a plant-level source-sink database for Liaoning Province and applied a MILP model enhanced with DBSCAN to assess mitigation potential, costs, and matching strategies. Annual CO₂ emissions from coal power, steel, and cement plants reached 112.43, 141.32, and 22.04 Mt. Storage capacity in oil fields and saline aquifers totaled 25.69 Gt. However, most oil fields cannot independently meet sequestration needs. Within 250 km, 13 cement plants could be matched, achieving 9.09 Mt CO₂ mitigation demand at –42.24 $/t. Clustering oil fields into three groups increased cement-sector mitigation to 10.32 Mt and lowered costs to –87.88 $/t, although this configuration did not support matches for steel plants or coal-fired power plants. This is a planning-oriented screening and matching study conducted under specific assumptions: a 250 km transport distance limit, a project start year of 2030, and a 30-year operational lifetime, rather than a full dynamic deployment pathway analysis. This study offers a theoretical foundation and pathway reference for other industrial provinces under storage-constrained conditions.

Abstract Image

CCUS在高排放行业的部署潜力及经济成本分析——以辽宁省为例
实现中国的双碳目标需要加速CCUS的部署,但排放集中、场址级储存有限的省份仍未得到充分研究。本研究为辽宁省开发了一个工厂级源汇数据库,并应用经过DBSCAN增强的MILP模型来评估缓解潜力、成本和匹配策略。燃煤电厂、钢铁厂、水泥厂的年CO₂排放量分别为112.43亿吨、141.32亿吨、220.4亿吨。油田和咸水层的储存量为25.69亿吨,但大部分油田无法独立满足封存需求。在250公里范围内,13家水泥厂可以匹配,以-42.24美元/吨的价格实现909万吨二氧化碳减排需求。将油田分成三组,将水泥部门的减排量提高到1032万吨,将成本降低到-87.88美元/吨,尽管这种配置不支持钢铁厂或燃煤电厂的匹配。这是一个以规划为导向的筛选和匹配研究,在特定的假设下进行:250公里的运输距离限制,项目启动年份为2030年,运行寿命为30年,而不是一个完整的动态部署路径分析。本研究可为其他工业省份在储能受限条件下提供理论基础和路径参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
9.20
自引率
10.30%
发文量
199
审稿时长
4.8 months
期刊介绍: The International Journal of Greenhouse Gas Control is a peer reviewed journal focusing on scientific and engineering developments in greenhouse gas control through capture and storage at large stationary emitters in the power sector and in other major resource, manufacturing and production industries. The Journal covers all greenhouse gas emissions within the power and industrial sectors, and comprises both technical and non-technical related literature in one volume. Original research, review and comments papers are included.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书