{"title":"Time-dependent deterioration of shotcrete under accelerated calcium leaching at varying flow velocities","authors":"Jiahe Wang, Jiaxuan Wang, Yu Gao, Huajian Li","doi":"10.1007/s11043-026-09920-1","DOIUrl":null,"url":null,"abstract":"<div><p>Understanding the deterioration of shotcrete exposed to flowing water is essential for improving the durability of tunnel support structures. This work investigated the effects of alkali-free accelerator dosage, flow velocity, and curing duration on shotcrete deterioration using accelerated leaching tests in 6 mol/L ammonium chloride solution. Accelerator dosages of 0–8%, flow velocities of 0–2 m/s, and curing durations of 7–28 days were examined. Compressive strength, mass loss, and apparent leaching depth were measured, while low-field nuclear magnetic resonance, X-ray diffraction, and backscattered electron imaging with energy-dispersive X-ray spectroscopy characterized changes in pore structure, phase composition, and calcium distribution. Exposure increased porosity, particularly within the 0.01–0.1 μm pore-size range, and depleted calcium-bearing phases in the affected regions. Flow velocity induced the largest deterioration changes within the investigated ranges. For specimens containing 8% accelerator and cured for 28 days, increasing flow velocity from 0 to 2 m/s increased compressive strength loss from 69.3% to 91.7%, mass loss from 1.5% to 8.2%, and apparent leaching depth from 6.8 mm to at least 15 mm after 28 days of exposure. Higher accelerator dosages and shorter curing durations also intensified deterioration, consistent with their greater initial porosity and less compact microstructures. The findings support a mechanism in which flowing solution promotes calcium removal, while dissolution of calcium-bearing phases increases porosity and weakens the cementitious skeleton. Under the accelerated conditions investigated, controlling accelerator dosage, reducing flow velocity, and extending curing before exposure mitigated deterioration.</p></div>","PeriodicalId":698,"journal":{"name":"Mechanics of Time-Dependent Materials","volume":"30 4","pages":""},"PeriodicalIF":4.5000,"publicationDate":"2026-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mechanics of Time-Dependent Materials","FirstCategoryId":"88","ListUrlMain":"https://link.springer.com/article/10.1007/s11043-026-09920-1","RegionNum":4,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, CHARACTERIZATION & TESTING","Score":null,"Total":0}
引用次数: 0
Abstract
Understanding the deterioration of shotcrete exposed to flowing water is essential for improving the durability of tunnel support structures. This work investigated the effects of alkali-free accelerator dosage, flow velocity, and curing duration on shotcrete deterioration using accelerated leaching tests in 6 mol/L ammonium chloride solution. Accelerator dosages of 0–8%, flow velocities of 0–2 m/s, and curing durations of 7–28 days were examined. Compressive strength, mass loss, and apparent leaching depth were measured, while low-field nuclear magnetic resonance, X-ray diffraction, and backscattered electron imaging with energy-dispersive X-ray spectroscopy characterized changes in pore structure, phase composition, and calcium distribution. Exposure increased porosity, particularly within the 0.01–0.1 μm pore-size range, and depleted calcium-bearing phases in the affected regions. Flow velocity induced the largest deterioration changes within the investigated ranges. For specimens containing 8% accelerator and cured for 28 days, increasing flow velocity from 0 to 2 m/s increased compressive strength loss from 69.3% to 91.7%, mass loss from 1.5% to 8.2%, and apparent leaching depth from 6.8 mm to at least 15 mm after 28 days of exposure. Higher accelerator dosages and shorter curing durations also intensified deterioration, consistent with their greater initial porosity and less compact microstructures. The findings support a mechanism in which flowing solution promotes calcium removal, while dissolution of calcium-bearing phases increases porosity and weakens the cementitious skeleton. Under the accelerated conditions investigated, controlling accelerator dosage, reducing flow velocity, and extending curing before exposure mitigated deterioration.
期刊介绍:
Mechanics of Time-Dependent Materials accepts contributions dealing with the time-dependent mechanical properties of solid polymers, metals, ceramics, concrete, wood, or their composites. It is recognized that certain materials can be in the melt state as function of temperature and/or pressure. Contributions concerned with fundamental issues relating to processing and melt-to-solid transition behaviour are welcome, as are contributions addressing time-dependent failure and fracture phenomena. Manuscripts addressing environmental issues will be considered if they relate to time-dependent mechanical properties.
The journal promotes the transfer of knowledge between various disciplines that deal with the properties of time-dependent solid materials but approach these from different angles. Among these disciplines are: Mechanical Engineering, Aerospace Engineering, Chemical Engineering, Rheology, Materials Science, Polymer Physics, Design, and others.