Enhanced dam spillage prediction using lagged feedback random forests at Weija Dam, Ghana

IF 3.7 Q2 MULTIDISCIPLINARY SCIENCES
Michael Nyoagbe, Jonathan Arthur Quaye-Ballard, John Divine Wise Ayer, Yaw Mensah Asare, Tina Dzigbordi Wemegah
{"title":"Enhanced dam spillage prediction using lagged feedback random forests at Weija Dam, Ghana","authors":"Michael Nyoagbe,&nbsp;Jonathan Arthur Quaye-Ballard,&nbsp;John Divine Wise Ayer,&nbsp;Yaw Mensah Asare,&nbsp;Tina Dzigbordi Wemegah","doi":"10.1016/j.sciaf.2026.e03611","DOIUrl":null,"url":null,"abstract":"<div><div>Accurate prediction of dam spillage is essential for mitigating flood risks to downstream communities and for the optimal management of water resources. Existing machine learning models often struggle to capture the delayed hydrological responses that influence reservoir spillage. This limits their operational usefulness for early warning and reservoir management. This study proposes a lag-enhanced Random Forest forecasting framework, termed Lagged-Feedback Random Forest (LFRF), that systematically incorporates temporal feedback from historical data points to improve dam spillage prediction. The framework was benchmarked against three alternative approaches, Long Short-Term Memory (LSTM) networks, standard Random Forest (RF), and Artificial Neural Networks (ANN), as well as four additional contemporary architectures, XGBoost, LightGBM, CatBoost, and a Temporal Convolutional Network (TCN), using the Weija Dam's 15-year daily historical record and a 40-day lag structure. Models were evaluated using RMSE, MAE, and R² (in m³/s, consistent with the observed spillage discharge), alongside the dimensionless Correlation and T-test statistics. LFRF outperformed all other models with an R² of 0.94 and a Correlation of 0.97, with a T-test statistic of 0.078 indicating minimal systematic deviation from observed values; LFRF and LSTM achieved comparable, markedly lower prediction errors than RF and ANN. Standard RF, XGBoost, LightGBM, CatBoost, and ANN were evaluated as naive baselines using only current-day readings, without either the lagged features given to LFRF or the sequence-native architecture used by LSTM and a Temporal Convolutional Network; all five naive models performed similarly poorly regardless of algorithm sophistication. For the Weija Dam dataset and the configurations evaluated, access to lagged temporal information appeared to contribute more strongly to predictive performance than model architecture alone. These findings highlight the value of lagged features in Random Forest ensembles for dam spillage prediction and identify several lag “sweet spots” — 7-8 days, 15-17 days, 25-26 days, and approximately 30-40 days — at which LFRF provided consistently strong predictive performance that could support real-time operational decisions and risk mitigation at the dam.</div></div>","PeriodicalId":21690,"journal":{"name":"Scientific African","volume":"33 ","pages":"Article e03611"},"PeriodicalIF":3.7000,"publicationDate":"2026-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific African","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2468227626004369","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MULTIDISCIPLINARY SCIENCES","Score":null,"Total":0}
引用次数: 0

Abstract

Accurate prediction of dam spillage is essential for mitigating flood risks to downstream communities and for the optimal management of water resources. Existing machine learning models often struggle to capture the delayed hydrological responses that influence reservoir spillage. This limits their operational usefulness for early warning and reservoir management. This study proposes a lag-enhanced Random Forest forecasting framework, termed Lagged-Feedback Random Forest (LFRF), that systematically incorporates temporal feedback from historical data points to improve dam spillage prediction. The framework was benchmarked against three alternative approaches, Long Short-Term Memory (LSTM) networks, standard Random Forest (RF), and Artificial Neural Networks (ANN), as well as four additional contemporary architectures, XGBoost, LightGBM, CatBoost, and a Temporal Convolutional Network (TCN), using the Weija Dam's 15-year daily historical record and a 40-day lag structure. Models were evaluated using RMSE, MAE, and R² (in m³/s, consistent with the observed spillage discharge), alongside the dimensionless Correlation and T-test statistics. LFRF outperformed all other models with an R² of 0.94 and a Correlation of 0.97, with a T-test statistic of 0.078 indicating minimal systematic deviation from observed values; LFRF and LSTM achieved comparable, markedly lower prediction errors than RF and ANN. Standard RF, XGBoost, LightGBM, CatBoost, and ANN were evaluated as naive baselines using only current-day readings, without either the lagged features given to LFRF or the sequence-native architecture used by LSTM and a Temporal Convolutional Network; all five naive models performed similarly poorly regardless of algorithm sophistication. For the Weija Dam dataset and the configurations evaluated, access to lagged temporal information appeared to contribute more strongly to predictive performance than model architecture alone. These findings highlight the value of lagged features in Random Forest ensembles for dam spillage prediction and identify several lag “sweet spots” — 7-8 days, 15-17 days, 25-26 days, and approximately 30-40 days — at which LFRF provided consistently strong predictive performance that could support real-time operational decisions and risk mitigation at the dam.
利用滞后反馈随机森林在加纳Weija大坝增强大坝溢出预测
大坝溢流的准确预测对于减轻下游社区的洪水风险和优化水资源管理至关重要。现有的机器学习模型往往难以捕捉影响水库溢出的延迟水文响应。这限制了它们在早期预警和水库管理方面的业务效用。本研究提出了一个滞后增强随机森林预测框架,称为滞后反馈随机森林(LFRF),该框架系统地结合了历史数据点的时间反馈,以改进大坝溢出预测。该框架采用了三种替代方法,即长短期记忆(LSTM)网络、标准随机森林(RF)和人工神经网络(ANN),以及另外四种当代架构,XGBoost、LightGBM、CatBoost和时间卷积网络(TCN),使用了Weija大坝15年的每日历史记录和40天滞后结构。使用RMSE、MAE和R²(以m³/s为单位,与观测到的溢出流量一致)以及无因次相关和t检验统计量对模型进行评估。LFRF优于所有其他模型,R²为0.94,相关系数为0.97,t检验统计量为0.078,表明与观测值的系统偏差最小;LFRF和LSTM的预测误差明显低于RF和ANN。标准RF、XGBoost、LightGBM、CatBoost和ANN仅使用当前的数据作为初始基线进行评估,既没有LFRF的滞后特征,也没有LSTM和时间卷积网络使用的序列原生架构;不管算法的复杂程度如何,所有五种朴素模型的表现都很糟糕。对于魏家坝数据集和评估的配置,访问滞后时间信息似乎比单独的模型架构对预测性能的贡献更大。这些发现突出了随机森林集合中滞后特征对大坝溢出预测的价值,并确定了几个滞后“最佳点”——7-8天、15-17天、25-26天和大约30-40天——在这些点上,LFRF提供了持续强大的预测性能,可以支持大坝的实时运营决策和风险缓解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Scientific African
Scientific African Multidisciplinary-Multidisciplinary
CiteScore
5.60
自引率
3.40%
发文量
332
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书