Patient flow implications of delayed access to inpatient rehabilitation in Australian acute hospitals.

IF 1.4
Jane Wu, Yuriko Watanabe, Christine T Shiner, Abraham Arulanandam, Swee-Ling Toh, Louise Sellars
{"title":"Patient flow implications of delayed access to inpatient rehabilitation in Australian acute hospitals.","authors":"Jane Wu, Yuriko Watanabe, Christine T Shiner, Abraham Arulanandam, Swee-Ling Toh, Louise Sellars","doi":"10.1071/AH26106","DOIUrl":null,"url":null,"abstract":"<p><strong>Objective: </strong>Delays in transferring patients from acute care to inpatient rehabilitation contribute to hospital exit-block; however, the magnitude of rehabilitation-related delays is poorly quantified in contemporary health systems. This study aimed to quantify the time spent waiting for inpatient rehabilitation in Australian acute hospitals.</p><p><strong>Methods: </strong>Secondary analysis of a prospective observational cohort study of consecutive adult patients accepted for inpatient rehabilitation across two metropolitan tertiary hospitals in Sydney, Australia, over a 4-month period was performed. The main outcome measures were the time from rehabilitation readiness to transfer, and the proportion of acute bed-days spent waiting for rehabilitation.</p><p><strong>Results: </strong>Among the 373 patients accepted for inpatient rehabilitation, a total of 1499 acute bed-days were spent waiting for transfer. The overall acute length of stay for the cohort was 7953 days, indicating that 18.8% of all acute bed-days were occupied by patients waiting for rehabilitation transfer. The median wait time was 2 days (IQR 1-6). Although 40% of patients were transferred within 1 day of being deemed ready for rehabilitation, 42% waited ≥4 days, and 15.7% experienced delays exceeding 1 week.</p><p><strong>Conclusions: </strong>Delayed access to inpatient rehabilitation makes a substantial contribution to acute bed occupancy. Nearly one-fifth of acute bed-days among patients requiring inpatient rehabilitation were spent waiting for transfer. Strategies such as earlier identification of rehabilitation needs, in-reach rehabilitation in acute care, and expansion of subacute capacity may help reduce delays and improve hospital throughput.</p>","PeriodicalId":93891,"journal":{"name":"Australian health review : a publication of the Australian Hospital Association","volume":"50 3","pages":""},"PeriodicalIF":1.4000,"publicationDate":"2026-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian health review : a publication of the Australian Hospital Association","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1071/AH26106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Objective: Delays in transferring patients from acute care to inpatient rehabilitation contribute to hospital exit-block; however, the magnitude of rehabilitation-related delays is poorly quantified in contemporary health systems. This study aimed to quantify the time spent waiting for inpatient rehabilitation in Australian acute hospitals.

Methods: Secondary analysis of a prospective observational cohort study of consecutive adult patients accepted for inpatient rehabilitation across two metropolitan tertiary hospitals in Sydney, Australia, over a 4-month period was performed. The main outcome measures were the time from rehabilitation readiness to transfer, and the proportion of acute bed-days spent waiting for rehabilitation.

Results: Among the 373 patients accepted for inpatient rehabilitation, a total of 1499 acute bed-days were spent waiting for transfer. The overall acute length of stay for the cohort was 7953 days, indicating that 18.8% of all acute bed-days were occupied by patients waiting for rehabilitation transfer. The median wait time was 2 days (IQR 1-6). Although 40% of patients were transferred within 1 day of being deemed ready for rehabilitation, 42% waited ≥4 days, and 15.7% experienced delays exceeding 1 week.

Conclusions: Delayed access to inpatient rehabilitation makes a substantial contribution to acute bed occupancy. Nearly one-fifth of acute bed-days among patients requiring inpatient rehabilitation were spent waiting for transfer. Strategies such as earlier identification of rehabilitation needs, in-reach rehabilitation in acute care, and expansion of subacute capacity may help reduce delays and improve hospital throughput.

在澳大利亚急性医院延迟获得住院康复的病人流量影响。
目的:急症患者向住院康复患者转移的延误导致医院出口阻塞;然而,在当代卫生系统中,与康复有关的延误的严重程度很难量化。本研究旨在量化在澳大利亚急症医院等待住院康复的时间。方法:对一项前瞻性观察队列研究进行了二次分析,该研究对澳大利亚悉尼两家大城市三级医院连续接受住院康复治疗的成年患者进行了为期4个月的研究。主要观察指标为从康复准备到转院的时间,以及等待康复的急性住院天数的比例。结果:373例住院康复患者中,等待转院的急性住院日共计1499天。该队列的急性总住院时间为7953天,表明18.8%的急性住院日被等待康复转院的患者占用。中位等待时间为2天(IQR 1-6)。尽管40%的患者在被认为可以康复的1天内转移,42%的患者等待≥4天,15.7%的患者延迟超过1周。结论:延迟获得住院康复对急性床位占用有重要贡献。在需要住院康复的患者中,近五分之一的急性住院日都花在了等待转院上。诸如早期识别康复需求、急性护理中的可及康复以及扩大亚急性能力等战略可能有助于减少延误并提高医院吞吐量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书