Jane Wu, Yuriko Watanabe, Christine T Shiner, Abraham Arulanandam, Swee-Ling Toh, Louise Sellars
{"title":"Patient flow implications of delayed access to inpatient rehabilitation in Australian acute hospitals.","authors":"Jane Wu, Yuriko Watanabe, Christine T Shiner, Abraham Arulanandam, Swee-Ling Toh, Louise Sellars","doi":"10.1071/AH26106","DOIUrl":null,"url":null,"abstract":"<p><strong>Objective: </strong>Delays in transferring patients from acute care to inpatient rehabilitation contribute to hospital exit-block; however, the magnitude of rehabilitation-related delays is poorly quantified in contemporary health systems. This study aimed to quantify the time spent waiting for inpatient rehabilitation in Australian acute hospitals.</p><p><strong>Methods: </strong>Secondary analysis of a prospective observational cohort study of consecutive adult patients accepted for inpatient rehabilitation across two metropolitan tertiary hospitals in Sydney, Australia, over a 4-month period was performed. The main outcome measures were the time from rehabilitation readiness to transfer, and the proportion of acute bed-days spent waiting for rehabilitation.</p><p><strong>Results: </strong>Among the 373 patients accepted for inpatient rehabilitation, a total of 1499 acute bed-days were spent waiting for transfer. The overall acute length of stay for the cohort was 7953 days, indicating that 18.8% of all acute bed-days were occupied by patients waiting for rehabilitation transfer. The median wait time was 2 days (IQR 1-6). Although 40% of patients were transferred within 1 day of being deemed ready for rehabilitation, 42% waited ≥4 days, and 15.7% experienced delays exceeding 1 week.</p><p><strong>Conclusions: </strong>Delayed access to inpatient rehabilitation makes a substantial contribution to acute bed occupancy. Nearly one-fifth of acute bed-days among patients requiring inpatient rehabilitation were spent waiting for transfer. Strategies such as earlier identification of rehabilitation needs, in-reach rehabilitation in acute care, and expansion of subacute capacity may help reduce delays and improve hospital throughput.</p>","PeriodicalId":93891,"journal":{"name":"Australian health review : a publication of the Australian Hospital Association","volume":"50 3","pages":""},"PeriodicalIF":1.4000,"publicationDate":"2026-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian health review : a publication of the Australian Hospital Association","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1071/AH26106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Objective: Delays in transferring patients from acute care to inpatient rehabilitation contribute to hospital exit-block; however, the magnitude of rehabilitation-related delays is poorly quantified in contemporary health systems. This study aimed to quantify the time spent waiting for inpatient rehabilitation in Australian acute hospitals.
Methods: Secondary analysis of a prospective observational cohort study of consecutive adult patients accepted for inpatient rehabilitation across two metropolitan tertiary hospitals in Sydney, Australia, over a 4-month period was performed. The main outcome measures were the time from rehabilitation readiness to transfer, and the proportion of acute bed-days spent waiting for rehabilitation.
Results: Among the 373 patients accepted for inpatient rehabilitation, a total of 1499 acute bed-days were spent waiting for transfer. The overall acute length of stay for the cohort was 7953 days, indicating that 18.8% of all acute bed-days were occupied by patients waiting for rehabilitation transfer. The median wait time was 2 days (IQR 1-6). Although 40% of patients were transferred within 1 day of being deemed ready for rehabilitation, 42% waited ≥4 days, and 15.7% experienced delays exceeding 1 week.
Conclusions: Delayed access to inpatient rehabilitation makes a substantial contribution to acute bed occupancy. Nearly one-fifth of acute bed-days among patients requiring inpatient rehabilitation were spent waiting for transfer. Strategies such as earlier identification of rehabilitation needs, in-reach rehabilitation in acute care, and expansion of subacute capacity may help reduce delays and improve hospital throughput.