Coordinated capacity configuration and techno-economic assessment of a grid-connected hydro–wind–solar–pumped storage complementary system for long-distance UHVDC power transmission

IF 10.7 1区 环境科学与生态学 Q1 ENGINEERING, ENVIRONMENTAL
Journal of Cleaner Production Pub Date : 2026-08-18 Epub Date: 2026-08-03 DOI:10.1016/j.jclepro.2026.148998
Dezi Chen, Sibo Wang, Wenhao Zhang, Qiurong Li, Beibei Xu, Diyi Chen, Fangfang Li, Junxu Zou
{"title":"Coordinated capacity configuration and techno-economic assessment of a grid-connected hydro–wind–solar–pumped storage complementary system for long-distance UHVDC power transmission","authors":"Dezi Chen,&nbsp;Sibo Wang,&nbsp;Wenhao Zhang,&nbsp;Qiurong Li,&nbsp;Beibei Xu,&nbsp;Diyi Chen,&nbsp;Fangfang Li,&nbsp;Junxu Zou","doi":"10.1016/j.jclepro.2026.148998","DOIUrl":null,"url":null,"abstract":"<div><div>Against the background of the global low-carbon energy transition, long-distance power delivery from large-scale wind and photovoltaic bases to remote load centers has become an important pathway for improving renewable energy utilization. However, hydro–wind–solar–pumped storage complementary systems for ultra-high-voltage direct current power delivery still face two key challenges. The first is the difficulty of formulating stable transmission profiles. The second is the mismatch between generation-side capacity and grid-side transmission capacity. To address these challenges, this study develops a source–grid coordinated optimization framework with transmission corridor capacity treated as a rigid engineering constraint. Photovoltaic installed capacity and transmission corridor capacity are defined as the core decision variables. A multi-timescale dual-layer dispatch model is incorporated into the proposed framework. The CRITIC–GLDS multicriteria decision-making method is further integrated to identify the economically optimal scheme within the technical feasibility domain. A clean energy base in the upper reaches of the Yellow River, comprising 2320 MW of hydropower capacity and 4200 MW of pumped storage capacity, is selected as the case study. The results show that stable transmission profiles can be generated under a 95% export plan fulfillment rate constraint. The economically optimal matching relationship between transmission corridor capacity and photovoltaic installed capacity is approximately 1:2.5. The preferred configuration is identified as 18 GW photovoltaic capacity and 8 GW transmission corridor capacity. Under this configuration, the levelized cost of electricity is 256.62 RMB/MWh, the transmission corridor utilization rate is 61.78%, and the renewable energy utilization rate is 91.11%. This study provides decision support for the long-distance transmission of large-scale renewable energy bases and source–grid coordinated planning.</div></div>","PeriodicalId":349,"journal":{"name":"Journal of Cleaner Production","volume":"574 ","pages":"Article 148998"},"PeriodicalIF":10.7000,"publicationDate":"2026-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cleaner Production","FirstCategoryId":"93","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0959652626015398","RegionNum":1,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/8/3 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENGINEERING, ENVIRONMENTAL","Score":null,"Total":0}
引用次数: 0

Abstract

Against the background of the global low-carbon energy transition, long-distance power delivery from large-scale wind and photovoltaic bases to remote load centers has become an important pathway for improving renewable energy utilization. However, hydro–wind–solar–pumped storage complementary systems for ultra-high-voltage direct current power delivery still face two key challenges. The first is the difficulty of formulating stable transmission profiles. The second is the mismatch between generation-side capacity and grid-side transmission capacity. To address these challenges, this study develops a source–grid coordinated optimization framework with transmission corridor capacity treated as a rigid engineering constraint. Photovoltaic installed capacity and transmission corridor capacity are defined as the core decision variables. A multi-timescale dual-layer dispatch model is incorporated into the proposed framework. The CRITIC–GLDS multicriteria decision-making method is further integrated to identify the economically optimal scheme within the technical feasibility domain. A clean energy base in the upper reaches of the Yellow River, comprising 2320 MW of hydropower capacity and 4200 MW of pumped storage capacity, is selected as the case study. The results show that stable transmission profiles can be generated under a 95% export plan fulfillment rate constraint. The economically optimal matching relationship between transmission corridor capacity and photovoltaic installed capacity is approximately 1:2.5. The preferred configuration is identified as 18 GW photovoltaic capacity and 8 GW transmission corridor capacity. Under this configuration, the levelized cost of electricity is 256.62 RMB/MWh, the transmission corridor utilization rate is 61.78%, and the renewable energy utilization rate is 91.11%. This study provides decision support for the long-distance transmission of large-scale renewable energy bases and source–grid coordinated planning.
超高压直流长距离输电并网水电-风能-太阳能抽水蓄能互补系统协调容量配置及技术经济评价
在全球低碳能源转型的大背景下,大型风电、光伏基地向偏远负荷中心的远程输电已成为提高可再生能源利用率的重要途径。然而,用于超高压直流输电的水力-风能-太阳能抽水蓄能互补系统仍面临两个关键挑战。首先是制定稳定的传输剖面的困难。二是发电侧容量与电网侧输电容量不匹配。为了解决这些挑战,本研究开发了一个源网协调优化框架,将输电走廊容量视为刚性工程约束。将光伏装机容量和输电走廊容量定义为核心决策变量。提出了一种多时间尺度双层调度模型。进一步整合critical - glds多准则决策方法,在技术可行性范围内确定经济最优方案。以黄河上游某清洁能源基地为例,该基地水电装机容量为2320 MW,抽水蓄能装机容量为4200 MW。结果表明,在95%的出口计划完成率约束下,可以生成稳定的输电剖面。输电走廊容量与光伏装机容量的经济最优匹配关系约为1:25 .5。优选配置为18 GW光伏容量和8 GW输电走廊容量。在该配置下,电力平准化成本为256.62元/兆瓦时,输电走廊利用率为61.78%,可再生能源利用率为91.11%。为大型可再生能源基地远距离输电和源网协同规划提供决策支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Cleaner Production
Journal of Cleaner Production 环境科学-工程:环境
CiteScore
20.40
自引率
9.00%
发文量
4720
审稿时长
111 days
期刊介绍: The Journal of Cleaner Production is an international, transdisciplinary journal that addresses and discusses theoretical and practical Cleaner Production, Environmental, and Sustainability issues. It aims to help societies become more sustainable by focusing on the concept of 'Cleaner Production', which aims at preventing waste production and increasing efficiencies in energy, water, resources, and human capital use. The journal serves as a platform for corporations, governments, education institutions, regions, and societies to engage in discussions and research related to Cleaner Production, environmental, and sustainability practices.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书