Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

IF 8.5 1区 地球科学 Q1 ENVIRONMENTAL SCIENCES
Earths Future Pub Date : 2026-08-01 DOI:10.1029/2025EF007725
Kendall Mongird, Kerem Ziya Akdemir, Cameron Bracken, Casey D. Burleyson, Travis Thurber, Chris R. Vernon, Mengqi Zhao, Jennie S. Rice
{"title":"Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection","authors":"Kendall Mongird,&nbsp;Kerem Ziya Akdemir,&nbsp;Cameron Bracken,&nbsp;Casey D. Burleyson,&nbsp;Travis Thurber,&nbsp;Chris R. Vernon,&nbsp;Mengqi Zhao,&nbsp;Jennie S. Rice","doi":"10.1029/2025EF007725","DOIUrl":null,"url":null,"abstract":"<p>The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak energy demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario given local siting drivers. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the revenue driven by locational energy prices.</p>","PeriodicalId":48748,"journal":{"name":"Earths Future","volume":"14 8","pages":""},"PeriodicalIF":8.5000,"publicationDate":"2026-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1029/2025EF007725","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Earths Future","FirstCategoryId":"89","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1029/2025EF007725","RegionNum":1,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
引用次数: 0

Abstract

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak energy demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario given local siting drivers. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the revenue driven by locational energy prices.

Abstract Image

能源基础设施的未来:横跨西部互联的电厂选址的多尺度评估
由于人工智能、超大规模计算和电气化的兴起,美国西部电网正面临着前所未有的挑战,包括不可预测的峰值能源需求、日益多样化的发电资源以及快速增长的负荷。在这种不断增加的不确定性和可变性下,预测未来发电的发展方向对于维持一个强大而有弹性的电网至关重要。利用一个综合的多部门、多尺度建模框架,将人类-地球系统模型、小时负荷模型、地理空间电厂选址模型和小时电网运行模型联系起来,我们评估了2020年至2055年间8种不同未来的电厂景观演变。这些未来代表了大气条件、排放限制以及经济、技术和人口增长假设的广泛但合理的范围。我们发现,在这些未来,地方层面的发展可能因发电类型和能力建设而有很大差异。无论当地选址驱动因素如何,预计西部互联的特定区域都将看到大量的容量发展。此外,我们还确定,与位置能源价格驱动的收益相比,预计的发电厂位置受电网互连成本的影响更大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Earths Future
Earths Future ENVIRONMENTAL SCIENCESGEOSCIENCES, MULTIDI-GEOSCIENCES, MULTIDISCIPLINARY
CiteScore
11.00
自引率
7.30%
发文量
260
审稿时长
16 weeks
期刊介绍: Earth’s Future: A transdisciplinary open access journal, Earth’s Future focuses on the state of the Earth and the prediction of the planet’s future. By publishing peer-reviewed articles as well as editorials, essays, reviews, and commentaries, this journal will be the preeminent scholarly resource on the Anthropocene. It will also help assess the risks and opportunities associated with environmental changes and challenges.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书