Multi-Period Co-Optimization of Transmission and Wind Turbine Generation Expansion Planning with Short-Circuit Constraints Under Deregulated Environment

IF 6.2 1区 工程技术 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC
Zhaoqin Hu;Yunpeng Xiao;Xiuli Wang;Xifan Wang
{"title":"Multi-Period Co-Optimization of Transmission and Wind Turbine Generation Expansion Planning with Short-Circuit Constraints Under Deregulated Environment","authors":"Zhaoqin Hu;Yunpeng Xiao;Xiuli Wang;Xifan Wang","doi":"10.35833/MPCE.2025.000233","DOIUrl":null,"url":null,"abstract":"The increase in the penetration rate of renewable energy exacerbates the rise in system short-circuit level. Thus, short-circuit constraints (SCCs) are crucial in the co-optimization of transmission and generation expansion planning. The deregulated environment further complicates this process by assigning responsibilities for transmission and generation to separate market entities. This paper proposes a multi-period co-optimization method of transmission and wind turbine generation expansion planning to address this challenge. The transmission expansion planning (TEP) problem limits the short-circuit level, which could be elevated by lines, synchronous generators, and wind turbine generators. The method is formulated as a tri-level mixed-integer linear programming (MILP) problem, where an equilibrium problem with equilibrium constraints is formed at the second and third levels. This problem is restructured into a MILP problem with Nash equilibrium conditions via complementarity problem reformulation. We propose an iterative algorithm targeting the SCCs to solve it. The effectiveness of the proposed method is validated on the IEEE 24-bus reliability test system through comparisons with three existing TEP methods, analyzing the impact of SCCs and generation expansion planning on TEP and the system operating cost under a deregulated environment.","PeriodicalId":51326,"journal":{"name":"Journal of Modern Power Systems and Clean Energy","volume":"14 2","pages":"529-540"},"PeriodicalIF":6.2000,"publicationDate":"2026-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=11098772","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Modern Power Systems and Clean Energy","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/11098772/","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2025/7/28 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

The increase in the penetration rate of renewable energy exacerbates the rise in system short-circuit level. Thus, short-circuit constraints (SCCs) are crucial in the co-optimization of transmission and generation expansion planning. The deregulated environment further complicates this process by assigning responsibilities for transmission and generation to separate market entities. This paper proposes a multi-period co-optimization method of transmission and wind turbine generation expansion planning to address this challenge. The transmission expansion planning (TEP) problem limits the short-circuit level, which could be elevated by lines, synchronous generators, and wind turbine generators. The method is formulated as a tri-level mixed-integer linear programming (MILP) problem, where an equilibrium problem with equilibrium constraints is formed at the second and third levels. This problem is restructured into a MILP problem with Nash equilibrium conditions via complementarity problem reformulation. We propose an iterative algorithm targeting the SCCs to solve it. The effectiveness of the proposed method is validated on the IEEE 24-bus reliability test system through comparisons with three existing TEP methods, analyzing the impact of SCCs and generation expansion planning on TEP and the system operating cost under a deregulated environment.
放松管制环境下带短路约束的输电与风电扩容规划多时段协同优化
可再生能源普及率的提高加剧了系统短路水平的上升。因此,短路约束(SCCs)在输电和发电扩展规划的协同优化中至关重要。放松管制的环境通过将输电和发电的责任分配给不同的市场实体,使这一过程进一步复杂化。针对这一挑战,本文提出了一种输电和风力发电扩展规划的多时段协同优化方法。输电扩展规划(TEP)问题限制了短路水平,而线路、同步发电机和风力发电机可能会提高短路水平。该方法被表述为一个三层混合整数线性规划(MILP)问题,其中在第二层和第三层形成一个具有平衡约束的平衡问题。通过对互补问题的重新表述,将该问题转化为具有纳什均衡条件的MILP问题。我们提出了一种针对SCCs的迭代算法来求解它。通过与现有三种TEP方法的比较,在IEEE 24总线可靠性测试系统上验证了该方法的有效性,分析了在放松管制的环境下,SCCs和扩容规划对TEP和系统运行成本的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Modern Power Systems and Clean Energy
Journal of Modern Power Systems and Clean Energy ENGINEERING, ELECTRICAL & ELECTRONIC-
CiteScore
12.30
自引率
14.30%
发文量
97
审稿时长
13 weeks
期刊介绍: Journal of Modern Power Systems and Clean Energy (MPCE), commencing from June, 2013, is a newly established, peer-reviewed and quarterly published journal in English. It is the first international power engineering journal originated in mainland China. MPCE publishes original papers, short letters and review articles in the field of modern power systems with focus on smart grid technology and renewable energy integration, etc.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书