What will it Take to Build the World's Largest Data Center?: Meta's 5-Gigawatt AI Data Center is Forcing Engineers to Throw Out the Rule Book

IF 2.2 4区 工程技术 Q2 ENGINEERING, ELECTRICAL & ELECTRONIC
IEEE Spectrum Pub Date : 2026-04-01 Epub Date: 2026-04-07 DOI:10.1109/MSPEC.2026.11476980
Matthew S. Smith
{"title":"What will it Take to Build the World's Largest Data Center?: Meta's 5-Gigawatt AI Data Center is Forcing Engineers to Throw Out the Rule Book","authors":"Matthew S. Smith","doi":"10.1109/MSPEC.2026.11476980","DOIUrl":null,"url":null,"abstract":"The undying thirst for smarter (historically, that means larger) AI models and greater adoption of the ones we already have has led to an explosion in data-center construction projects, unparalleled both in number and scale. Chief among them is Meta's planned 5-gigawatt data center in Louisiana, called Hyperion, announced in June of 2025. Meta CEO Mark Zuckerberg said Hyperion will “cover a significant part of the footprint of Manhattan,” and the first phase—a 2-GW version—will be completed by 2030.","PeriodicalId":13249,"journal":{"name":"IEEE Spectrum","volume":"63 4","pages":"22-27"},"PeriodicalIF":2.2000,"publicationDate":"2026-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Spectrum","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/11476980/","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/4/7 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

The undying thirst for smarter (historically, that means larger) AI models and greater adoption of the ones we already have has led to an explosion in data-center construction projects, unparalleled both in number and scale. Chief among them is Meta's planned 5-gigawatt data center in Louisiana, called Hyperion, announced in June of 2025. Meta CEO Mark Zuckerberg said Hyperion will “cover a significant part of the footprint of Manhattan,” and the first phase—a 2-GW version—will be completed by 2030.
建造世界上最大的数据中心需要什么?Meta的5千兆瓦人工智能数据中心正迫使工程师们抛弃规则手册
对更智能(从历史上看,这意味着更大)的人工智能模型的永恒渴望,以及对现有模型的更多采用,导致了数据中心建设项目的爆炸式增长,在数量和规模上都是无与伦比的。其中最主要的是Meta计划于2025年6月在路易斯安那州建立一个5千兆瓦的数据中心,名为Hyperion。Meta首席执行官马克·扎克伯格表示,Hyperion将“覆盖曼哈顿的很大一部分”,第一阶段(2gw版本)将于2030年完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
IEEE Spectrum
IEEE Spectrum 工程技术-工程:电子与电气
CiteScore
2.50
自引率
0.00%
发文量
254
审稿时长
4-8 weeks
期刊介绍: IEEE Spectrum Magazine, the flagship publication of the IEEE, explores the development, applications and implications of new technologies. It anticipates trends in engineering, science, and technology, and provides a forum for understanding, discussion and leadership in these areas. IEEE Spectrum is the world''s leading engineering and scientific magazine. Read by over 300,000 engineers worldwide, Spectrum provides international coverage of all technical issues and advances in computers, communications, and electronics. Written in clear, concise language for the non-specialist, Spectrum''s high editorial standards and worldwide resources ensure technical accuracy and state-of-the-art relevance.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书