Evaluating the key causes and impacts of delays in municipal construction projects in Nepal

IF 2.3 Q2 DEVELOPMENT STUDIES
World Development Perspectives Pub Date : 2026-03-01 Epub Date: 2026-02-26 DOI:10.1016/j.wdp.2026.100769
Madhav Prasad Koirala , Asmita Bhusal Master of Science in Construction Management
{"title":"Evaluating the key causes and impacts of delays in municipal construction projects in Nepal","authors":"Madhav Prasad Koirala ,&nbsp;Asmita Bhusal Master of Science in Construction Management","doi":"10.1016/j.wdp.2026.100769","DOIUrl":null,"url":null,"abstract":"<div><div>Delays are a common problem in construction endeavors, greatly affecting projects and their stakeholders. This research delves into the reasons and repercussions of delays in Nepal’s municipal construction projects, offering crucial insights into contributing elements. The study utilized the Relative Importance Index (RII) to identify 54 causes and 20 impacts of delays. Significant causes include challenging soil conditions, delayed budget releases, and poor client-contractor communication. Data from clients, contractors, consultancies, and case studies revealed additional factors like price surges and equipment shortages. In road and bridge construction, bids averaging 37.52% below tender prices lead to increased costs, schedule overruns, disruptions, and resource inefficiencies. In Shuklagandaki Municipality, 89.81% of construction initiatives encountered delays, with the worst case reaching a 795% overrun for the Mankauri Motor Margha upgrade. The main causes of these delays include ineffective contract planning, COVID-19 effects, a lack of materials, and underbidding. The report offers targeted recommendations for clients, consultants, and contractors, stressing the importance of collaboration to reduce delays. The findings underscore the need for enhanced project management methods to achieve better construction outcomes in the area. The study advocates for a nationwide analysis to devise strategies that address the primary causes of delays in municipal construction projects across Nepal.</div></div>","PeriodicalId":37831,"journal":{"name":"World Development Perspectives","volume":"41 ","pages":"Article 100769"},"PeriodicalIF":2.3000,"publicationDate":"2026-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Development Perspectives","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2452292926000123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/26 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"DEVELOPMENT STUDIES","Score":null,"Total":0}
引用次数: 0

Abstract

Delays are a common problem in construction endeavors, greatly affecting projects and their stakeholders. This research delves into the reasons and repercussions of delays in Nepal’s municipal construction projects, offering crucial insights into contributing elements. The study utilized the Relative Importance Index (RII) to identify 54 causes and 20 impacts of delays. Significant causes include challenging soil conditions, delayed budget releases, and poor client-contractor communication. Data from clients, contractors, consultancies, and case studies revealed additional factors like price surges and equipment shortages. In road and bridge construction, bids averaging 37.52% below tender prices lead to increased costs, schedule overruns, disruptions, and resource inefficiencies. In Shuklagandaki Municipality, 89.81% of construction initiatives encountered delays, with the worst case reaching a 795% overrun for the Mankauri Motor Margha upgrade. The main causes of these delays include ineffective contract planning, COVID-19 effects, a lack of materials, and underbidding. The report offers targeted recommendations for clients, consultants, and contractors, stressing the importance of collaboration to reduce delays. The findings underscore the need for enhanced project management methods to achieve better construction outcomes in the area. The study advocates for a nationwide analysis to devise strategies that address the primary causes of delays in municipal construction projects across Nepal.
评估尼泊尔市政建设项目延误的主要原因和影响
延迟是建设工作中的常见问题,极大地影响了项目及其利益相关者。本研究深入探讨了尼泊尔市政建设项目延误的原因和影响,为促成因素提供了重要见解。该研究利用相对重要性指数(RII)确定了延误的54个原因和20个影响。主要原因包括恶劣的土壤条件、延迟的预算发布和糟糕的客户-承包商沟通。来自客户、承包商、咨询公司和案例研究的数据揭示了价格飙升和设备短缺等其他因素。在道路和桥梁建设中,平均投标价格低于投标价格37.52%,导致成本增加,进度超支,中断和资源效率低下。在Shuklagandaki市,89.81%的施工计划遇到了延误,最糟糕的情况是Mankauri Motor Margha升级超过了795%。造成这些延误的主要原因包括合同规划不力、新冠疫情影响、材料缺乏和投标不足。该报告为客户、顾问和承包商提供了有针对性的建议,强调了合作减少延误的重要性。研究结果强调需要加强项目管理方法,以在该地区取得更好的建设成果。这项研究提倡在全国范围内进行分析,以制定策略,解决尼泊尔各地市政建设项目延误的主要原因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
World Development Perspectives
World Development Perspectives Social Sciences-Sociology and Political Science
CiteScore
4.50
自引率
0.00%
发文量
65
审稿时长
84 days
期刊介绍: World Development Perspectives is a multi-disciplinary journal of international development. It seeks to explore ways of improving human well-being by examining the performance and impact of interventions designed to address issues related to: poverty alleviation, public health and malnutrition, agricultural production, natural resource governance, globalization and transnational processes, technological progress, gender and social discrimination, and participation in economic and political life. Above all, we are particularly interested in the role of historical, legal, social, economic, political, biophysical, and/or ecological contexts in shaping development processes and outcomes.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书