BAP and Time-variant QCSP Modeling and Optimization

IF 6.3 2区 工程技术 Q1 ENGINEERING, CIVIL
Ocean Engineering Pub Date : 2026-04-30 Epub Date: 2026-02-21 DOI:10.1016/j.oceaneng.2026.124721
Cheng Cheng , Zengshuang Li , Yong Zhang
{"title":"BAP and Time-variant QCSP Modeling and Optimization","authors":"Cheng Cheng ,&nbsp;Zengshuang Li ,&nbsp;Yong Zhang","doi":"10.1016/j.oceaneng.2026.124721","DOIUrl":null,"url":null,"abstract":"<div><div>Enhanced data sharing between shipping companies and ports fosters seamless cooperation and more efficient use of terminal resources. This study addresses the integrated Berth Allocation Problem (BAP) and Time-variant Quay Crane Scheduling Problem (QCSP) in container terminals, aiming to optimize vessel berthing order, timing, and dynamic quay crane assignments. A Mixed Integer Linear Programming (MILP) model is introduced alongside a novel solution framework that combines Adaptive Large Neighborhood Search (ALNS) with Reinforcement Learning (RL). The integrated ALNS-RL framework sequentially updates ship sequences and quay crane schedules, enabling efficient convergence to high-quality solutions within limited iterations. Numerical experiments demonstrate that: 1) The proposed method yields superior solutions, reducing port stay time by 7.61% and quay crane idle rate by 13.48%; 2) The ratio of terminal berths to quay cranes significantly impacts operational efficiency, with an optimal allocation ratio identified; 3) The approach effectively handles instances from small to large scale, including problems with 30 berths and 90 vessels. Furthermore, the ALNS-RL framework outperforms both standard ALNS and a Hybrid Genetic Algorithm (HGA), achieving a minimal average deviation of 0.5% from the best solution—significantly better than ALNS (2.64%) and HGA (4.07%). While computationally efficient for small problems, the method demonstrates particular strength in large-scale instances, establishing its robustness for complex, real-world terminal scheduling applications.</div></div>","PeriodicalId":19403,"journal":{"name":"Ocean Engineering","volume":"353 ","pages":"Article 124721"},"PeriodicalIF":6.3000,"publicationDate":"2026-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ocean Engineering","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S002980182600555X","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/21 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Enhanced data sharing between shipping companies and ports fosters seamless cooperation and more efficient use of terminal resources. This study addresses the integrated Berth Allocation Problem (BAP) and Time-variant Quay Crane Scheduling Problem (QCSP) in container terminals, aiming to optimize vessel berthing order, timing, and dynamic quay crane assignments. A Mixed Integer Linear Programming (MILP) model is introduced alongside a novel solution framework that combines Adaptive Large Neighborhood Search (ALNS) with Reinforcement Learning (RL). The integrated ALNS-RL framework sequentially updates ship sequences and quay crane schedules, enabling efficient convergence to high-quality solutions within limited iterations. Numerical experiments demonstrate that: 1) The proposed method yields superior solutions, reducing port stay time by 7.61% and quay crane idle rate by 13.48%; 2) The ratio of terminal berths to quay cranes significantly impacts operational efficiency, with an optimal allocation ratio identified; 3) The approach effectively handles instances from small to large scale, including problems with 30 berths and 90 vessels. Furthermore, the ALNS-RL framework outperforms both standard ALNS and a Hybrid Genetic Algorithm (HGA), achieving a minimal average deviation of 0.5% from the best solution—significantly better than ALNS (2.64%) and HGA (4.07%). While computationally efficient for small problems, the method demonstrates particular strength in large-scale instances, establishing its robustness for complex, real-world terminal scheduling applications.
BAP与时变QCSP建模与优化
加强航运公司和港口之间的数据共享,促进无缝合作和更有效地利用码头资源。本文研究了集装箱码头的综合泊位分配问题(BAP)和时变码头起重机调度问题(QCSP),旨在优化船舶靠泊顺序、靠泊时间和动态码头起重机分配。引入了混合整数线性规划(MILP)模型以及结合自适应大邻域搜索(ALNS)和强化学习(RL)的新型解决方案框架。集成的ALNS-RL框架依次更新船舶序列和码头起重机时间表,能够在有限的迭代中有效地收敛到高质量的解决方案。数值实验结果表明:1)该方法可使港口停留时间缩短7.61%,码头起重机空转率减少13.48%;2)码头泊位与岸吊的比例显著影响作业效率,并确定了最优配置比例;3)该方法有效地处理了从小到大的问题,包括30个泊位和90艘船舶的问题。此外,ALNS- rl框架优于标准ALNS和混合遗传算法(HGA),与最佳解的平均偏差最小为0.5%,显著优于ALNS(2.64%)和HGA(4.07%)。虽然对于小问题计算效率高,但该方法在大规模实例中表现出特别的强度,为复杂的实际终端调度应用建立了鲁棒性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Ocean Engineering
Ocean Engineering 工程技术-工程:大洋
CiteScore
7.30
自引率
34.00%
发文量
2379
审稿时长
8.1 months
期刊介绍: Ocean Engineering provides a medium for the publication of original research and development work in the field of ocean engineering. Ocean Engineering seeks papers in the following topics.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书