Manu Centeno-Telleria , Raúl Guanche , Markel Penalba
{"title":"Scaling up floating offshore wind farm installation: From conventional to modular strategies","authors":"Manu Centeno-Telleria , Raúl Guanche , Markel Penalba","doi":"10.1016/j.apenergy.2026.127560","DOIUrl":null,"url":null,"abstract":"<div><div>With only small-scale floating offshore wind (FOW) farms installed to date, and commercial-scale projects anticipated in the coming years, reconsidering conventional installation strategies is essential to understand the challenges associated with scaling up. To this end, this paper introduces a novel discrete-event simulation model, <em>instaSIM®</em>, which is validated against data corresponding to the Hywind Scotland farm, demonstrating discrepancies of less than five days between simulated and observed durations. Once validated, different scenarios for scaling up FOW installation are evaluated. Results indicate that farms comprising more than 10–15 turbines cannot be installed within a single year using the conventional installation strategy, with installation costs increasing significantly due to metocean-related delays. To address these limitations, three modular installation strategies are proposed and evaluated for a 40-turbine and 600-MW FOW farm: parallel, consecutive and hybrid. Compared to the conventional baseline of 1200 days and 225 M€, all three strategies reduce total installation costs by 54%. However, the total duration varies across strategies: the parallel approach requires 137 days (88% reduction), while the hybrid strategy requires 500 days (58% lower) and the consecutive configuration extends to 1232 days. In addition to cost savings, the modular strategies enable an earlier power generation and faster CAPEX recovery. By the time the conventional strategy completes installation and starts producing energy, the consecutive, hybrid and parallel approaches would have already produced 3.8 TWh, 6.4 TWh and 7.7 TWh of electricity, respectively, corresponding to revenues of 840 M€, 1370 M€ and 1650 M€, and CAPEX recoveries of 29%, 48% and 57%.</div></div>","PeriodicalId":246,"journal":{"name":"Applied Energy","volume":"410 ","pages":"Article 127560"},"PeriodicalIF":12.2000,"publicationDate":"2026-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Energy","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0306261926002126","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/19 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0
Abstract
With only small-scale floating offshore wind (FOW) farms installed to date, and commercial-scale projects anticipated in the coming years, reconsidering conventional installation strategies is essential to understand the challenges associated with scaling up. To this end, this paper introduces a novel discrete-event simulation model, instaSIM®, which is validated against data corresponding to the Hywind Scotland farm, demonstrating discrepancies of less than five days between simulated and observed durations. Once validated, different scenarios for scaling up FOW installation are evaluated. Results indicate that farms comprising more than 10–15 turbines cannot be installed within a single year using the conventional installation strategy, with installation costs increasing significantly due to metocean-related delays. To address these limitations, three modular installation strategies are proposed and evaluated for a 40-turbine and 600-MW FOW farm: parallel, consecutive and hybrid. Compared to the conventional baseline of 1200 days and 225 M€, all three strategies reduce total installation costs by 54%. However, the total duration varies across strategies: the parallel approach requires 137 days (88% reduction), while the hybrid strategy requires 500 days (58% lower) and the consecutive configuration extends to 1232 days. In addition to cost savings, the modular strategies enable an earlier power generation and faster CAPEX recovery. By the time the conventional strategy completes installation and starts producing energy, the consecutive, hybrid and parallel approaches would have already produced 3.8 TWh, 6.4 TWh and 7.7 TWh of electricity, respectively, corresponding to revenues of 840 M€, 1370 M€ and 1650 M€, and CAPEX recoveries of 29%, 48% and 57%.
期刊介绍:
Applied Energy serves as a platform for sharing innovations, research, development, and demonstrations in energy conversion, conservation, and sustainable energy systems. The journal covers topics such as optimal energy resource use, environmental pollutant mitigation, and energy process analysis. It welcomes original papers, review articles, technical notes, and letters to the editor. Authors are encouraged to submit manuscripts that bridge the gap between research, development, and implementation. The journal addresses a wide spectrum of topics, including fossil and renewable energy technologies, energy economics, and environmental impacts. Applied Energy also explores modeling and forecasting, conservation strategies, and the social and economic implications of energy policies, including climate change mitigation. It is complemented by the open-access journal Advances in Applied Energy.