Modeling and tackling unit commitment constraint screening under uncertainty

IF 12.2 1区 工程技术 Q1 ENERGY & FUELS
Applied Energy Pub Date : 2026-05-01 Epub Date: 2026-02-24 DOI:10.1016/j.apenergy.2026.127582
Xuan He , Honglin Wen , Yufan Zhang , Yize Chen , Danny H.K. Tsang
{"title":"Modeling and tackling unit commitment constraint screening under uncertainty","authors":"Xuan He ,&nbsp;Honglin Wen ,&nbsp;Yufan Zhang ,&nbsp;Yize Chen ,&nbsp;Danny H.K. Tsang","doi":"10.1016/j.apenergy.2026.127582","DOIUrl":null,"url":null,"abstract":"<div><div>Day-ahead unit commitment (UC) is a fundamental task for power system operators, where generator statuses and power dispatch are determined based on the forecasted nodal net demands. The errors inherent in renewables and load forecasting require uncertainty-aware UC solution procedures, which are nontrivial and time-consuming to solve. In this work, we design a novel screening approach under the forecasting uncertainty to achieve both computation efficiency and solution reliability requirements. Our approach accommodates such uncertainties in both chance-constrained (CC) and robust forms (RO), and can greatly reduce the UC instance size by screening out non-binding constraints. To further improve the screening efficiency, we build upon multi-parametric programming (MPP) theory to convert the underlying screening optimization problem into a piecewise affine function. A multi-area screening approach is further developed to handle the computational intractability issues for large-scale problems. We verify the proposed method’s performance on various UC setups and uncertainty situations. Experimental results show that our robust screening procedure can guarantee better feasibility, while the CC screening can produce more efficient reduced models. On average, the screening time for a single line flow constraint can be accelerated by 71.2X to 131.3X using our proposed method.</div></div>","PeriodicalId":246,"journal":{"name":"Applied Energy","volume":"410 ","pages":"Article 127582"},"PeriodicalIF":12.2000,"publicationDate":"2026-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Energy","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0306261926002345","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/24 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

Day-ahead unit commitment (UC) is a fundamental task for power system operators, where generator statuses and power dispatch are determined based on the forecasted nodal net demands. The errors inherent in renewables and load forecasting require uncertainty-aware UC solution procedures, which are nontrivial and time-consuming to solve. In this work, we design a novel screening approach under the forecasting uncertainty to achieve both computation efficiency and solution reliability requirements. Our approach accommodates such uncertainties in both chance-constrained (CC) and robust forms (RO), and can greatly reduce the UC instance size by screening out non-binding constraints. To further improve the screening efficiency, we build upon multi-parametric programming (MPP) theory to convert the underlying screening optimization problem into a piecewise affine function. A multi-area screening approach is further developed to handle the computational intractability issues for large-scale problems. We verify the proposed method’s performance on various UC setups and uncertainty situations. Experimental results show that our robust screening procedure can guarantee better feasibility, while the CC screening can produce more efficient reduced models. On average, the screening time for a single line flow constraint can be accelerated by 71.2X to 131.3X using our proposed method.
不确定条件下机组承诺约束筛选的建模与处理
日前机组承诺(UC)是电力系统运营商的一项基本任务,其中发电机状态和电力调度是根据预测的节点网络需求来确定的。可再生能源和负荷预测固有的错误需要具有不确定性意识的统一通信解决方案程序,这是一项重要且耗时的解决方案。在此工作中,我们设计了一种新的预测不确定性筛选方法,以满足计算效率和求解可靠性的要求。我们的方法在机会约束(CC)和鲁棒形式(RO)中都适应了这种不确定性,并且可以通过筛选非约束性约束大大减少UC实例的大小。为了进一步提高筛选效率,我们建立了多参数规划(MPP)理论,将潜在的筛选优化问题转化为分段仿射函数。进一步发展了一种多区域筛选方法来处理大规模问题的计算难解性问题。我们验证了该方法在各种UC设置和不确定情况下的性能。实验结果表明,我们的鲁棒筛选程序可以保证更好的可行性,而CC筛选可以产生更有效的简化模型。平均而言,使用我们提出的方法,单线流约束的筛选时间可以加快71.2倍至131.3倍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Applied Energy
Applied Energy 工程技术-工程:化工
CiteScore
21.20
自引率
10.70%
发文量
1830
审稿时长
41 days
期刊介绍: Applied Energy serves as a platform for sharing innovations, research, development, and demonstrations in energy conversion, conservation, and sustainable energy systems. The journal covers topics such as optimal energy resource use, environmental pollutant mitigation, and energy process analysis. It welcomes original papers, review articles, technical notes, and letters to the editor. Authors are encouraged to submit manuscripts that bridge the gap between research, development, and implementation. The journal addresses a wide spectrum of topics, including fossil and renewable energy technologies, energy economics, and environmental impacts. Applied Energy also explores modeling and forecasting, conservation strategies, and the social and economic implications of energy policies, including climate change mitigation. It is complemented by the open-access journal Advances in Applied Energy.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书