Hybrid power purchase agreements for flexible 24/7 Energy delivery – A comprehensive review of current practices and research pathways

IF 12.2 1区 工程技术 Q1 ENERGY & FUELS
Applied Energy Pub Date : 2026-05-01 Epub Date: 2026-02-16 DOI:10.1016/j.apenergy.2026.127509
Dongwei Zhao , Zhi Zhou , Daniel Boff , Alisha Fernandez
{"title":"Hybrid power purchase agreements for flexible 24/7 Energy delivery – A comprehensive review of current practices and research pathways","authors":"Dongwei Zhao ,&nbsp;Zhi Zhou ,&nbsp;Daniel Boff ,&nbsp;Alisha Fernandez","doi":"10.1016/j.apenergy.2026.127509","DOIUrl":null,"url":null,"abstract":"<div><div>Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.</div></div>","PeriodicalId":246,"journal":{"name":"Applied Energy","volume":"410 ","pages":"Article 127509"},"PeriodicalIF":12.2000,"publicationDate":"2026-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Energy","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0306261926001613","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/16 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.
灵活的24/7能源交付的混合电力购买协议——对当前实践和研究途径的全面回顾
电力购买协议(PPAs)越来越受到大型能源消费者(如数据中心)的青睐,以确保具有成本效益的能源并满足不断增长的需求。传统上,基于可变可再生能源(VRE)的购电协议是在按产付费的基础上运行的,在相对较长的时间内(例如,每年)平衡供需。然而,重点正在转向以小时为基础匹配供需,以充分满足能源需求。这种转变需要整合灵活的能源资源,如水电、火力发电和储能,以补充风能和太阳能等VRE资源,形成24/7 PPA的基础。这项工作的贡献是:(i)在PPA价格和技术组合数据的支持下,审查PPA采购的新兴市场趋势和当前做法;(ii)综合现有文献关于24/7 PPA设计中合同定价、数量、混合资源采购和风险管理的建模方法,同时确定关键的研究差距;(iii)从PPA供应商和消费者的角度提出一个综合的24/7 PPA设计框架以及两种签约机制。提出的框架强调了24/7 PPA设计的关键建模挑战、风险分配问题和未来的研究机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Applied Energy
Applied Energy 工程技术-工程:化工
CiteScore
21.20
自引率
10.70%
发文量
1830
审稿时长
41 days
期刊介绍: Applied Energy serves as a platform for sharing innovations, research, development, and demonstrations in energy conversion, conservation, and sustainable energy systems. The journal covers topics such as optimal energy resource use, environmental pollutant mitigation, and energy process analysis. It welcomes original papers, review articles, technical notes, and letters to the editor. Authors are encouraged to submit manuscripts that bridge the gap between research, development, and implementation. The journal addresses a wide spectrum of topics, including fossil and renewable energy technologies, energy economics, and environmental impacts. Applied Energy also explores modeling and forecasting, conservation strategies, and the social and economic implications of energy policies, including climate change mitigation. It is complemented by the open-access journal Advances in Applied Energy.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书