Digital twin system for deepwater well construction: Enhancing operational efficiency and safety

IF 6.3 2区 工程技术 Q1 ENGINEERING, CIVIL
Ocean Engineering Pub Date : 2026-04-15 Epub Date: 2026-02-09 DOI:10.1016/j.oceaneng.2026.124378
Dongsheng Xu , Jin Yang , Haiyan Zheng , Bin Chen , De Yan , Jianchun Fan , Qingying Tang , Yingfang Zhou
{"title":"Digital twin system for deepwater well construction: Enhancing operational efficiency and safety","authors":"Dongsheng Xu ,&nbsp;Jin Yang ,&nbsp;Haiyan Zheng ,&nbsp;Bin Chen ,&nbsp;De Yan ,&nbsp;Jianchun Fan ,&nbsp;Qingying Tang ,&nbsp;Yingfang Zhou","doi":"10.1016/j.oceaneng.2026.124378","DOIUrl":null,"url":null,"abstract":"<div><div>Deepwater oil and gas resources are vital to global energy supply, yet their development often faces challenges such as prolonged construction cycles, low efficiency, high emissions, and operational failures. To tackle these challenges, this study analyzes how operational and geotechnical factors affect conductor installation time and bearing capacity, during jetting and waiting stages. The intelligent optimization algorithm integrating MT-FCNN, LSTM, and PSO was proposed. A digital twin system for deepwater well construction is established for the first time, employing a modularly coupled architecture to integrate installation and post-installation processes. Validation results show that the DWC system exhibits strong performance in predicting jetting flow rates and controlling ROP during conductor installation. The model achieved a coefficient of determination R<sup>2</sup> above 0.95 and MAPE below 6 %. In beach-scale experiments, all measured values of time-varying bearing capacity fell within the 95 % confidence interval of the DWC system predictions, demonstrating its high accuracy. Finally, the case study was conducted to analyze the impact of flow rate and waiting time on construction parameters and operational decisions. The findings provide a solid theoretical and technical foundation for intelligent decision-making and enhanced reliability in deepwater well construction.</div></div>","PeriodicalId":19403,"journal":{"name":"Ocean Engineering","volume":"352 ","pages":"Article 124378"},"PeriodicalIF":6.3000,"publicationDate":"2026-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ocean Engineering","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S002980182600212X","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2026/2/9 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Deepwater oil and gas resources are vital to global energy supply, yet their development often faces challenges such as prolonged construction cycles, low efficiency, high emissions, and operational failures. To tackle these challenges, this study analyzes how operational and geotechnical factors affect conductor installation time and bearing capacity, during jetting and waiting stages. The intelligent optimization algorithm integrating MT-FCNN, LSTM, and PSO was proposed. A digital twin system for deepwater well construction is established for the first time, employing a modularly coupled architecture to integrate installation and post-installation processes. Validation results show that the DWC system exhibits strong performance in predicting jetting flow rates and controlling ROP during conductor installation. The model achieved a coefficient of determination R2 above 0.95 and MAPE below 6 %. In beach-scale experiments, all measured values of time-varying bearing capacity fell within the 95 % confidence interval of the DWC system predictions, demonstrating its high accuracy. Finally, the case study was conducted to analyze the impact of flow rate and waiting time on construction parameters and operational decisions. The findings provide a solid theoretical and technical foundation for intelligent decision-making and enhanced reliability in deepwater well construction.
深水井建设数字孪生系统:提高作业效率和安全性
深水油气资源对全球能源供应至关重要,但其开发往往面临施工周期长、效率低、排放高、操作失败等挑战。为了应对这些挑战,本研究分析了在喷射和等待阶段,操作和岩土因素如何影响导体安装时间和承载能力。提出了将MT-FCNN、LSTM和粒子群算法相结合的智能优化算法。首次建立了用于深水井施工的数字孪生系统,采用模块化耦合架构集成安装和安装后流程。验证结果表明,DWC系统在预测喷流速率和控制钻速方面表现出色。模型的决定系数R2大于0.95,MAPE小于6%。在海滩尺度实验中,实测的时变承载力值均落在DWC系统预测值的95%置信区间内,具有较高的准确性。最后,通过实例分析了流量和等待时间对施工参数和运营决策的影响。研究结果为深水井建设的智能化决策和可靠性提高提供了坚实的理论和技术基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Ocean Engineering
Ocean Engineering 工程技术-工程:大洋
CiteScore
7.30
自引率
34.00%
发文量
2379
审稿时长
8.1 months
期刊介绍: Ocean Engineering provides a medium for the publication of original research and development work in the field of ocean engineering. Ocean Engineering seeks papers in the following topics.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书