{"title":"Stochastic-Distributionally Robust Joint Optimisation for Multi-Stage Planning of Park Integrated Energy System Considering V2G Response and PV Uncertainty","authors":"Jianwei Chen, Zhejing Bao, Miao Yu","doi":"10.1049/gtd2.70191","DOIUrl":null,"url":null,"abstract":"<p>This paper proposes a multi-stage planning framework for park integrated energy systems (PIES), integrating stochastic optimisation and distributionally robust optimisation (DRO) to address the uncertainties of vehicle-to-grid (V2G) response and photovoltaic (PV) generation. The framework fully leverages the potential of electric vehicles (EVs) stationed in the park during working hours as schedulable energy storage while ensuring their energy needs for post-work commutes. The arrival and departure times of individual EVs, as well as their energy demands for post-work travel, are modelled using Monte Carlo simulation. A price incentive mechanism is introduced to encourage EV owners to participate in scheduling, with explicit consideration of EV battery degradation. Furthermore, a scenario probability-driven DRO method is employed to manage PV generation uncertainty. Simulation results demonstrate that, for long-term planning with steadily increasing demands, the proposed multi-stage approach effectively avoids redundant equipment configuration and enhances economics compared to a one-shot decision. V2G participation significantly reduces equipment investment costs, operational expenses, and carbon emissions. Meanwhile, the DRO planning model achieves an optimal balance between economic efficiency and planning robustness by combining the benefits of stochastic and robust optimisation.</p>","PeriodicalId":13261,"journal":{"name":"Iet Generation Transmission & Distribution","volume":"19 1","pages":""},"PeriodicalIF":2.8000,"publicationDate":"2025-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ietresearch.onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.70191","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iet Generation Transmission & Distribution","FirstCategoryId":"5","ListUrlMain":"https://ietresearch.onlinelibrary.wiley.com/doi/10.1049/gtd2.70191","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0
Abstract
This paper proposes a multi-stage planning framework for park integrated energy systems (PIES), integrating stochastic optimisation and distributionally robust optimisation (DRO) to address the uncertainties of vehicle-to-grid (V2G) response and photovoltaic (PV) generation. The framework fully leverages the potential of electric vehicles (EVs) stationed in the park during working hours as schedulable energy storage while ensuring their energy needs for post-work commutes. The arrival and departure times of individual EVs, as well as their energy demands for post-work travel, are modelled using Monte Carlo simulation. A price incentive mechanism is introduced to encourage EV owners to participate in scheduling, with explicit consideration of EV battery degradation. Furthermore, a scenario probability-driven DRO method is employed to manage PV generation uncertainty. Simulation results demonstrate that, for long-term planning with steadily increasing demands, the proposed multi-stage approach effectively avoids redundant equipment configuration and enhances economics compared to a one-shot decision. V2G participation significantly reduces equipment investment costs, operational expenses, and carbon emissions. Meanwhile, the DRO planning model achieves an optimal balance between economic efficiency and planning robustness by combining the benefits of stochastic and robust optimisation.
期刊介绍:
IET Generation, Transmission & Distribution is intended as a forum for the publication and discussion of current practice and future developments in electric power generation, transmission and distribution. Practical papers in which examples of good present practice can be described and disseminated are particularly sought. Papers of high technical merit relying on mathematical arguments and computation will be considered, but authors are asked to relegate, as far as possible, the details of analysis to an appendix.
The scope of IET Generation, Transmission & Distribution includes the following:
Design of transmission and distribution systems
Operation and control of power generation
Power system management, planning and economics
Power system operation, protection and control
Power system measurement and modelling
Computer applications and computational intelligence in power flexible AC or DC transmission systems
Special Issues. Current Call for papers:
Next Generation of Synchrophasor-based Power System Monitoring, Operation and Control - https://digital-library.theiet.org/files/IET_GTD_CFP_NGSPSMOC.pdf