Brandt Sandman, Paul Wach, Alejandro Salado, Joe Gregory, Taylan G. Topcu, Geoffrey Kerr
{"title":"Digital Engineering Testbed for Test and Evaluation: Operation Safe Passage Status and Lessons Learned","authors":"Brandt Sandman, Paul Wach, Alejandro Salado, Joe Gregory, Taylan G. Topcu, Geoffrey Kerr","doi":"10.1002/iis2.70024","DOIUrl":null,"url":null,"abstract":"<p>With the digital paradigm, many evaluations may be conducted through digital modeling and analysis as well as data fusion means that combine digital and physical test results. Our research aims to contribute to the digital transformation of T&E through creation of a framework and testbed to prove-in the methods and tools as we progress through a roadmap of tiers of T&E transformation. We present our vision and transformation status using a fictitious case study referred to as Operation Safe Passage and findings following the conduct of a mock interim design review.</p>","PeriodicalId":100663,"journal":{"name":"INCOSE International Symposium","volume":"35 1","pages":"535-553"},"PeriodicalIF":0.0000,"publicationDate":"2025-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INCOSE International Symposium","FirstCategoryId":"1085","ListUrlMain":"https://incose.onlinelibrary.wiley.com/doi/10.1002/iis2.70024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
With the digital paradigm, many evaluations may be conducted through digital modeling and analysis as well as data fusion means that combine digital and physical test results. Our research aims to contribute to the digital transformation of T&E through creation of a framework and testbed to prove-in the methods and tools as we progress through a roadmap of tiers of T&E transformation. We present our vision and transformation status using a fictitious case study referred to as Operation Safe Passage and findings following the conduct of a mock interim design review.