Easing renegotiation rules in public procurement: Evidence from a policy reform

IF 4.8 1区 经济学 Q1 ECONOMICS
Kris De Jaegher , Michal Šoltés , Vítězslav Titl
{"title":"Easing renegotiation rules in public procurement: Evidence from a policy reform","authors":"Kris De Jaegher ,&nbsp;Michal Šoltés ,&nbsp;Vítězslav Titl","doi":"10.1016/j.jpubeco.2025.105445","DOIUrl":null,"url":null,"abstract":"<div><div>Public procurement contracts require frequent renegotiation. Exploiting a natural experiment induced by the implementation of an EU policy in the Czech Republic, we examine the effect of easing renegotiation rules on the outcomes of public procurement. We document that the policy decreased winning bids but did not change the final price, as post-award renegotiations offset the initial bid reductions. We find no evidence of a decline in the quality of the delivered procurement projects. We rationalize our findings using a stylized theoretical model.</div></div>","PeriodicalId":48436,"journal":{"name":"Journal of Public Economics","volume":"248 ","pages":"Article 105445"},"PeriodicalIF":4.8000,"publicationDate":"2025-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Economics","FirstCategoryId":"96","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0047272725001434","RegionNum":1,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 0

Abstract

Public procurement contracts require frequent renegotiation. Exploiting a natural experiment induced by the implementation of an EU policy in the Czech Republic, we examine the effect of easing renegotiation rules on the outcomes of public procurement. We document that the policy decreased winning bids but did not change the final price, as post-award renegotiations offset the initial bid reductions. We find no evidence of a decline in the quality of the delivered procurement projects. We rationalize our findings using a stylized theoretical model.
放宽公共采购中的重新谈判规则:来自政策改革的证据
公共采购合同需要经常重新谈判。利用捷克共和国实施欧盟政策引发的自然实验,我们研究了放宽重新谈判规则对公共采购结果的影响。我们的文件表明,该政策减少了中标,但没有改变最终价格,因为中标后的重新谈判抵消了最初的投标削减。我们没有发现交付的采购项目质量下降的证据。我们用一个程式化的理论模型来合理化我们的发现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
14.10
自引率
2.00%
发文量
139
审稿时长
70 days
期刊介绍: The Journal of Public Economics aims to promote original scientific research in the field of public economics, focusing on the utilization of contemporary economic theory and quantitative analysis methodologies. It serves as a platform for the international scholarly community to engage in discussions on public policy matters.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信