Improvement In Fatigue Properties Of Welded Joints Using Crack Initiation Resistant Steel Part2:Fatigue Crack Initiation Life Of Rib-To-Deck Welded Joints Of Orthotropic Steel Bridge Decks
{"title":"Improvement In Fatigue Properties Of Welded Joints Using Crack Initiation Resistant Steel Part2:Fatigue Crack Initiation Life Of Rib-To-Deck Welded Joints Of Orthotropic Steel Bridge Decks","authors":"Akito Tabata , Masahiro Matsushita , Tetsuo Yamaguchi , Yasuhito Takashima , Toshiyuki Ishikawa","doi":"10.1016/j.prostr.2025.06.075","DOIUrl":null,"url":null,"abstract":"<div><div>Fatigue durability is one of the problems in the maintenance of bridges. One of the areas of concern for fatigue crack initiation, the weld between the U-shaped rib and the deck of Orthotropic Steel Decks is known. The fatigue crack initiation life of a rib - to - deck welded joints was investigated using a developed steel with high crack initiation resistance. As a result, when the developed steel was used for the deck, the crack initiation life was prolonged by about 1.5 times compared with the case where the conventional steel was applied.</div></div>","PeriodicalId":20518,"journal":{"name":"Procedia Structural Integrity","volume":"68 ","pages":"Pages 415-419"},"PeriodicalIF":0.0000,"publicationDate":"2025-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Procedia Structural Integrity","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2452321625000769","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Fatigue durability is one of the problems in the maintenance of bridges. One of the areas of concern for fatigue crack initiation, the weld between the U-shaped rib and the deck of Orthotropic Steel Decks is known. The fatigue crack initiation life of a rib - to - deck welded joints was investigated using a developed steel with high crack initiation resistance. As a result, when the developed steel was used for the deck, the crack initiation life was prolonged by about 1.5 times compared with the case where the conventional steel was applied.