Evolution of bus rapid transit concepts in Sub-Saharan Africa: towards lighter design and incremental deployment

IF 4.6 3区 工程技术 Q1 ECONOMICS
Alison Chetty, Christoffel Venter
{"title":"Evolution of bus rapid transit concepts in Sub-Saharan Africa: towards lighter design and incremental deployment","authors":"Alison Chetty,&nbsp;Christoffel Venter","doi":"10.1016/j.retrec.2025.101604","DOIUrl":null,"url":null,"abstract":"<div><div>While Bus Rapid Transit (BRT) has matured into a standardised set of technologies worldwide, its slow adoption in Sub-Saharan African (SSA) cities has raised questions about its suitability in some contexts. A number of key factors affect BRT adoption in SSA, including poorly developed road networks, constrained demand and affordability limits, and the strength and importance of the legacy informal public transport (PT) ecosystem. In response, some cities have increasingly departed from the conventional infrastructure-heavy BRT design approach towards lighter, more incremental deployment concepts, in an effort to better match local realities and constraints. This paper aims to describe this shift and put it into the context of a continuum of BRT deployment approaches. A literature review presents clarifying terminology and an overview of recent BRT system design in SSA cities. We then describe a phased implementation approach evolving in South African cities that focus on improving existing services gradually towards the final BRT design. Two examples of BRT evolution in large (City of Tshwane) and medium-sized (Rustenburg) cities are described in more detail. The potential implications of design standards are explored and provide insight for cities in developing countries seeking designs best-suited to enhance PT services with limited funding.</div></div>","PeriodicalId":47810,"journal":{"name":"Research in Transportation Economics","volume":"112 ","pages":"Article 101604"},"PeriodicalIF":4.6000,"publicationDate":"2025-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Research in Transportation Economics","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0739885925000873","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 0

Abstract

While Bus Rapid Transit (BRT) has matured into a standardised set of technologies worldwide, its slow adoption in Sub-Saharan African (SSA) cities has raised questions about its suitability in some contexts. A number of key factors affect BRT adoption in SSA, including poorly developed road networks, constrained demand and affordability limits, and the strength and importance of the legacy informal public transport (PT) ecosystem. In response, some cities have increasingly departed from the conventional infrastructure-heavy BRT design approach towards lighter, more incremental deployment concepts, in an effort to better match local realities and constraints. This paper aims to describe this shift and put it into the context of a continuum of BRT deployment approaches. A literature review presents clarifying terminology and an overview of recent BRT system design in SSA cities. We then describe a phased implementation approach evolving in South African cities that focus on improving existing services gradually towards the final BRT design. Two examples of BRT evolution in large (City of Tshwane) and medium-sized (Rustenburg) cities are described in more detail. The potential implications of design standards are explored and provide insight for cities in developing countries seeking designs best-suited to enhance PT services with limited funding.
撒哈拉以南非洲地区快速公交概念的演变:走向轻量化设计和增量部署
尽管快速公交系统(BRT)在全球范围内已经发展成为一套成熟的标准化技术,但在撒哈拉以南非洲(SSA)的城市中,BRT的缓慢采用引发了人们对其在某些情况下的适用性的质疑。许多关键因素影响着SSA地区BRT的采用,包括道路网络不发达、需求受限和负担能力限制,以及传统非正式公共交通(PT)生态系统的实力和重要性。因此,一些城市越来越多地从传统的以基础设施为主的BRT设计方法转向更轻、更渐进的部署概念,以更好地适应当地的实际情况和限制。本文旨在描述这种转变,并将其置于BRT部署方法的连续体的背景下。一篇文献综述提出了澄清术语和概述最近在SSA城市的快速公交系统设计。然后,我们描述了在南非城市中逐步发展的分阶段实施方法,该方法侧重于逐步改善现有服务,最终实现BRT设计。更详细地描述了两个大型(茨瓦内市)和中型(勒斯滕堡)城市BRT发展的例子。探讨了设计标准的潜在影响,并为发展中国家的城市在资金有限的情况下寻求最适合的设计来加强PT服务提供了见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
8.40
自引率
2.60%
发文量
59
审稿时长
60 days
期刊介绍: Research in Transportation Economics is a journal devoted to the dissemination of high quality economics research in the field of transportation. The content covers a wide variety of topics relating to the economics aspects of transportation, government regulatory policies regarding transportation, and issues of concern to transportation industry planners. The unifying theme throughout the papers is the application of economic theory and/or applied economic methodologies to transportation questions.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信