{"title":"Heat exchange efficiency and structural stability of assembled energy shafts: a novel shallow geothermal exploitation system for coastal urban cities","authors":"Jie Zhou, Xin Wang, Jie Xu, Zhenming Shi","doi":"10.1186/s40517-025-00350-9","DOIUrl":null,"url":null,"abstract":"<div><p>As a crucial solution to the challenge of limited urban underground space development, the assembled shaft offers extensive structure–soil contact surfaces and meantime holds significant potential for shallow geothermal energy exploitation. In this paper, we propose an assembled energy shaft, i.e. a novel geothermal development system, in which the heat exchanger could be easily installed in the shaft concrete with extensive soil–contact area and can have superior protection without extra pre-drilling. This paper establishes a heat transfer model for energy shafts in soft soil areas. By comparing the heat transfer efficiency and additional thermal stress of the energy tunnel in Beijing, the practical feasibility of constructing energy shafts in coastal cities is demonstrated. By proposing the characterization parameters of heat exchange capacity per unit lining surface area and heat exchange per unit length of pipe, it is revealed that thermal interference is minimized when the heat exchange pipe spacing of the energy shaft is 0.25–0.3 m. The heat exchange efficiency is increased when the fluid flow rate is 0.6 m/s ~ 0.9 m/s. According to the deformation characteristics of the lining, the maximum tensile and compressive stresses occur near the inlet of the heat exchange pipe. To minimize stress concentration, it is advisable to position the inlet of the heat exchange pipe at the center of the segment. The research findings confirm the substantial potential of assembled energy shafts in shallow geothermal development and provide valuable insights for the design of such shafts in coastal cities.</p></div>","PeriodicalId":48643,"journal":{"name":"Geothermal Energy","volume":"13 1","pages":""},"PeriodicalIF":2.9000,"publicationDate":"2025-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://geothermal-energy-journal.springeropen.com/counter/pdf/10.1186/s40517-025-00350-9","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geothermal Energy","FirstCategoryId":"89","ListUrlMain":"https://link.springer.com/article/10.1186/s40517-025-00350-9","RegionNum":2,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0
Abstract
As a crucial solution to the challenge of limited urban underground space development, the assembled shaft offers extensive structure–soil contact surfaces and meantime holds significant potential for shallow geothermal energy exploitation. In this paper, we propose an assembled energy shaft, i.e. a novel geothermal development system, in which the heat exchanger could be easily installed in the shaft concrete with extensive soil–contact area and can have superior protection without extra pre-drilling. This paper establishes a heat transfer model for energy shafts in soft soil areas. By comparing the heat transfer efficiency and additional thermal stress of the energy tunnel in Beijing, the practical feasibility of constructing energy shafts in coastal cities is demonstrated. By proposing the characterization parameters of heat exchange capacity per unit lining surface area and heat exchange per unit length of pipe, it is revealed that thermal interference is minimized when the heat exchange pipe spacing of the energy shaft is 0.25–0.3 m. The heat exchange efficiency is increased when the fluid flow rate is 0.6 m/s ~ 0.9 m/s. According to the deformation characteristics of the lining, the maximum tensile and compressive stresses occur near the inlet of the heat exchange pipe. To minimize stress concentration, it is advisable to position the inlet of the heat exchange pipe at the center of the segment. The research findings confirm the substantial potential of assembled energy shafts in shallow geothermal development and provide valuable insights for the design of such shafts in coastal cities.
Geothermal EnergyEarth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
5.90
自引率
7.10%
发文量
25
审稿时长
8 weeks
期刊介绍:
Geothermal Energy is a peer-reviewed fully open access journal published under the SpringerOpen brand. It focuses on fundamental and applied research needed to deploy technologies for developing and integrating geothermal energy as one key element in the future energy portfolio. Contributions include geological, geophysical, and geochemical studies; exploration of geothermal fields; reservoir characterization and modeling; development of productivity-enhancing methods; and approaches to achieve robust and economic plant operation. Geothermal Energy serves to examine the interaction of individual system components while taking the whole process into account, from the development of the reservoir to the economic provision of geothermal energy.