Automatic inspection and assessment of a cross-passage twin tunnel using UAV

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY
Ran Zhang , Chao Wang , Zili Li
{"title":"Automatic inspection and assessment of a cross-passage twin tunnel using UAV","authors":"Ran Zhang ,&nbsp;Chao Wang ,&nbsp;Zili Li","doi":"10.1016/j.autcon.2025.106200","DOIUrl":null,"url":null,"abstract":"<div><div>The inspection of large-scale tunnel networks is essential to identify any long-term deterioration mechanisms. Traditional manual inspection is not automatic and adaptive in geometrically complex tunnel configurations. This paper presents an automatic unmanned aerial vehicle (UAV)-based tunnel assessment application in a critical cross-passage twin tunnel section of Dublin Port Tunnel. It adopts a reactive method for UAV navigation and photogrammetry, and a point cloud for data processing. This study specifically verifies the patterns of cross-section deformation and defect distribution in twin tunnels and discovers that the deterioration pattern agrees with previous monitoring results. It shows that observed tunnel deformation could be attributed to the effect of twin tunnel interaction and vehicle cross passage, whilst the distribution of lining cracks could be associated with the differential structural stiffness and the differential longitudinal bending along the tunnel section.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"175 ","pages":"Article 106200"},"PeriodicalIF":9.6000,"publicationDate":"2025-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580525002407","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

The inspection of large-scale tunnel networks is essential to identify any long-term deterioration mechanisms. Traditional manual inspection is not automatic and adaptive in geometrically complex tunnel configurations. This paper presents an automatic unmanned aerial vehicle (UAV)-based tunnel assessment application in a critical cross-passage twin tunnel section of Dublin Port Tunnel. It adopts a reactive method for UAV navigation and photogrammetry, and a point cloud for data processing. This study specifically verifies the patterns of cross-section deformation and defect distribution in twin tunnels and discovers that the deterioration pattern agrees with previous monitoring results. It shows that observed tunnel deformation could be attributed to the effect of twin tunnel interaction and vehicle cross passage, whilst the distribution of lining cracks could be associated with the differential structural stiffness and the differential longitudinal bending along the tunnel section.
基于无人机的跨通道双隧道自动检测与评估
大型隧道网络的检查对于确定任何长期恶化机制至关重要。对于几何形状复杂的隧道结构,传统的人工检测不具有自动适应性。本文介绍了一种基于无人机(UAV)的隧道评估方法在都柏林港隧道关键跨通道双隧道段中的应用。采用响应式方法进行无人机导航和摄影测量,采用点云进行数据处理。本研究具体验证了双隧洞断面变形和缺陷分布规律,发现其劣化规律与以往的监测结果一致。结果表明,隧道变形主要受双隧道相互作用和车辆通行的影响,而衬砌裂缝分布则与隧道截面结构刚度差异和纵向弯曲差异有关。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信