Productivity Improvement of Garments Industry by Implementing Line Balancing Algorithms—A Case Study

IF 1.8 Q3 COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS
Mst. Anjuman Ara, Nafisa Anjum, Dilir Ahbab, Mushfica Takia Sidiika, Risat Rimi Chowdhury
{"title":"Productivity Improvement of Garments Industry by Implementing Line Balancing Algorithms—A Case Study","authors":"Mst. Anjuman Ara,&nbsp;Nafisa Anjum,&nbsp;Dilir Ahbab,&nbsp;Mushfica Takia Sidiika,&nbsp;Risat Rimi Chowdhury","doi":"10.1002/eng2.70125","DOIUrl":null,"url":null,"abstract":"<p>Nowadays, the apparel industry is highly competitive worldwide and requires the correct application of industrial engineering techniques such as time study and line balancing techniques for productivity improvement. Productivity improvement in the readymade garments industry is mostly dependent on lead time as well as the cost of production. This research aims to recommend an effective layout and line-balancing strategy so that downtime, process bottlenecks, the number of workstations, and the required number of personnel can be minimized to improve the efficiency of the production line. For this purpose, three different heuristics approaches named the Ranked Positional Weight (RPW) method, the Largest Candidate Rule (LCR), and the Kilbridge &amp; Wester method are implemented for analyzing the production line. After the implementation of line balancing techniques, it was found that all three methods improved the line efficiency compared to the existing line efficiency. Among the three heuristics methods, the RPW method and LCR increased efficiency more compared to the Kilbridge and Wester method (KWM). By lowering the current 42 workstations to 23, the RPW method and LCR demonstrated an improvement in the line efficiency of the current hemming unit to 79.80% from 43.70%. The RPW approach or LCR will be effective in terms of efficiency in this particular situation. Finally, an efficient and improved balanced line is suggested with a new sequence of processes and an optimally designed layout which will minimize the idle time and manpower requirement. The derived results demonstrate that the devised model can effectively assist production managers in garment manufacturing organizations in managing line efficiency.</p>","PeriodicalId":72922,"journal":{"name":"Engineering reports : open access","volume":"7 4","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2025-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/eng2.70125","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering reports : open access","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/eng2.70125","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0

Abstract

Nowadays, the apparel industry is highly competitive worldwide and requires the correct application of industrial engineering techniques such as time study and line balancing techniques for productivity improvement. Productivity improvement in the readymade garments industry is mostly dependent on lead time as well as the cost of production. This research aims to recommend an effective layout and line-balancing strategy so that downtime, process bottlenecks, the number of workstations, and the required number of personnel can be minimized to improve the efficiency of the production line. For this purpose, three different heuristics approaches named the Ranked Positional Weight (RPW) method, the Largest Candidate Rule (LCR), and the Kilbridge & Wester method are implemented for analyzing the production line. After the implementation of line balancing techniques, it was found that all three methods improved the line efficiency compared to the existing line efficiency. Among the three heuristics methods, the RPW method and LCR increased efficiency more compared to the Kilbridge and Wester method (KWM). By lowering the current 42 workstations to 23, the RPW method and LCR demonstrated an improvement in the line efficiency of the current hemming unit to 79.80% from 43.70%. The RPW approach or LCR will be effective in terms of efficiency in this particular situation. Finally, an efficient and improved balanced line is suggested with a new sequence of processes and an optimally designed layout which will minimize the idle time and manpower requirement. The derived results demonstrate that the devised model can effectively assist production managers in garment manufacturing organizations in managing line efficiency.

Abstract Image

通过实施生产线平衡算法提高服装业生产率--案例研究
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
5.10
自引率
0.00%
发文量
0
审稿时长
19 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信