Optimization of Shut-In Time for Hydraulic Fracturing-Assisted Oil Displacement in Offshore Low-Permeability Reservoirs

IF 3.7 3区 化学 Q2 CHEMISTRY, MULTIDISCIPLINARY
Baojiang Duan, Qi Li, Zhenhua Cai, Kang Jiang, Fengjiao Wang, Yikun Liu, Mingxuan Chu*, Mengyao Ren, Zhiming Yan and Qiang Xie, 
{"title":"Optimization of Shut-In Time for Hydraulic Fracturing-Assisted Oil Displacement in Offshore Low-Permeability Reservoirs","authors":"Baojiang Duan,&nbsp;Qi Li,&nbsp;Zhenhua Cai,&nbsp;Kang Jiang,&nbsp;Fengjiao Wang,&nbsp;Yikun Liu,&nbsp;Mingxuan Chu*,&nbsp;Mengyao Ren,&nbsp;Zhiming Yan and Qiang Xie,&nbsp;","doi":"10.1021/acsomega.5c0020410.1021/acsomega.5c00204","DOIUrl":null,"url":null,"abstract":"<p >To optimize the shut-in time for hydraulic fracturing assisted oil displacement in offshore low-permeability reservoirs, a coupled mathematical model encompassing injection, shut-in well, and production is established. The accuracy of the model is validated using production data. The law of pressure diffusion and oil–water two-phase flow during the shut-in well process is clarified, and the mechanism of hydraulic fracturing assisted oil displacement to enhance oil recovery is summarized. The sensitivity analysis is conducted, and then the main controlling factors affecting the optimal shut-in time for hydraulic fracturing assisted oil displacement are identified. The research results indicate that the primary function of the shut-in well is to enhance the effect of formation energy supplementation after injection, thereby further increasing the swept volume, controlling greater geological reserves, and ultimately enhancing oil recovery. During the initial stage of shut-in well, a larger portion of geological reserves are controlled mainly by fluid pressure diffusion, while in the later stage, oil–water exchange is mainly achieved by imbibition effect. The main controlling factors affecting the shut-in time are cumulative injection volume, formation pressure coefficient before hydraulic fracturing assisted oil displacement, and permeability, which should be given special attention on site. The research results provide a theoretical basis for the design of shut-in time for hydraulic fracturing assisted oil displacement operations in offshore low-permeability reservoirs.</p>","PeriodicalId":22,"journal":{"name":"ACS Omega","volume":"10 12","pages":"12530–12542 12530–12542"},"PeriodicalIF":3.7000,"publicationDate":"2025-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://pubs.acs.org/doi/epdf/10.1021/acsomega.5c00204","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Omega","FirstCategoryId":"92","ListUrlMain":"https://pubs.acs.org/doi/10.1021/acsomega.5c00204","RegionNum":3,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

To optimize the shut-in time for hydraulic fracturing assisted oil displacement in offshore low-permeability reservoirs, a coupled mathematical model encompassing injection, shut-in well, and production is established. The accuracy of the model is validated using production data. The law of pressure diffusion and oil–water two-phase flow during the shut-in well process is clarified, and the mechanism of hydraulic fracturing assisted oil displacement to enhance oil recovery is summarized. The sensitivity analysis is conducted, and then the main controlling factors affecting the optimal shut-in time for hydraulic fracturing assisted oil displacement are identified. The research results indicate that the primary function of the shut-in well is to enhance the effect of formation energy supplementation after injection, thereby further increasing the swept volume, controlling greater geological reserves, and ultimately enhancing oil recovery. During the initial stage of shut-in well, a larger portion of geological reserves are controlled mainly by fluid pressure diffusion, while in the later stage, oil–water exchange is mainly achieved by imbibition effect. The main controlling factors affecting the shut-in time are cumulative injection volume, formation pressure coefficient before hydraulic fracturing assisted oil displacement, and permeability, which should be given special attention on site. The research results provide a theoretical basis for the design of shut-in time for hydraulic fracturing assisted oil displacement operations in offshore low-permeability reservoirs.

求助全文
约1分钟内获得全文 求助全文
来源期刊
ACS Omega
ACS Omega Chemical Engineering-General Chemical Engineering
CiteScore
6.60
自引率
4.90%
发文量
3945
审稿时长
2.4 months
期刊介绍: ACS Omega is an open-access global publication for scientific articles that describe new findings in chemistry and interfacing areas of science, without any perceived evaluation of immediate impact.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信