Coordinated central-local control strategy for voltage management in PV-integrated distribution networks considering energy storage degradation

IF 10.1 1区 工程技术 Q1 ENERGY & FUELS
Wenhu Tang , Yunlin Huang , Tong Qian , Cihang Wei , Jianzhong Wu
{"title":"Coordinated central-local control strategy for voltage management in PV-integrated distribution networks considering energy storage degradation","authors":"Wenhu Tang ,&nbsp;Yunlin Huang ,&nbsp;Tong Qian ,&nbsp;Cihang Wei ,&nbsp;Jianzhong Wu","doi":"10.1016/j.apenergy.2025.125684","DOIUrl":null,"url":null,"abstract":"<div><div>In PV-integrated distribution networks, there is increasing interest in developing cost-effective voltage control strategies that utilize PV inverters and battery energy storage systems (BESS). However, energy storage often plays a secondary role in mitigating the inherent uncertainty of PV generation, and the associated maintenance and replacement costs of batteries due to improper scheduling are frequently overlooked. To address this issue, this paper proposes a coordinated central-local control strategy for voltage management in PV-integrated distribution networks, incorporating the cycle life degradation of energy storage. In the proposed strategy, the central controller formulates a multi-stage Wasserstein-based distributionally robust optimization problem based on the requirements of the distribution system operator (DSO). In the local hierarchy, each PV inverter adjusts reactive power output via the control curves improved by the central controller to manage rapid PV fluctuations. Additionally, battery replacement costs are allocated per discharge/charge cycle and incorporated into voltage control costs to assess the impact of short-term scheduling on long-term battery degradation. Simulation results show that the proposed strategy achieves the global optimal decision according to the required robustness and economy in the central hierarchy, while ensuring appropriate scheduling of BESS and minimizing the impact of scheduling on battery lifespan. Furthermore, the proposed strategy can effectively reduce voltage deviations caused by PV fluctuations.</div></div>","PeriodicalId":246,"journal":{"name":"Applied Energy","volume":"389 ","pages":"Article 125684"},"PeriodicalIF":10.1000,"publicationDate":"2025-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Energy","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0306261925004143","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

In PV-integrated distribution networks, there is increasing interest in developing cost-effective voltage control strategies that utilize PV inverters and battery energy storage systems (BESS). However, energy storage often plays a secondary role in mitigating the inherent uncertainty of PV generation, and the associated maintenance and replacement costs of batteries due to improper scheduling are frequently overlooked. To address this issue, this paper proposes a coordinated central-local control strategy for voltage management in PV-integrated distribution networks, incorporating the cycle life degradation of energy storage. In the proposed strategy, the central controller formulates a multi-stage Wasserstein-based distributionally robust optimization problem based on the requirements of the distribution system operator (DSO). In the local hierarchy, each PV inverter adjusts reactive power output via the control curves improved by the central controller to manage rapid PV fluctuations. Additionally, battery replacement costs are allocated per discharge/charge cycle and incorporated into voltage control costs to assess the impact of short-term scheduling on long-term battery degradation. Simulation results show that the proposed strategy achieves the global optimal decision according to the required robustness and economy in the central hierarchy, while ensuring appropriate scheduling of BESS and minimizing the impact of scheduling on battery lifespan. Furthermore, the proposed strategy can effectively reduce voltage deviations caused by PV fluctuations.
求助全文
约1分钟内获得全文 求助全文
来源期刊
Applied Energy
Applied Energy 工程技术-工程:化工
CiteScore
21.20
自引率
10.70%
发文量
1830
审稿时长
41 days
期刊介绍: Applied Energy serves as a platform for sharing innovations, research, development, and demonstrations in energy conversion, conservation, and sustainable energy systems. The journal covers topics such as optimal energy resource use, environmental pollutant mitigation, and energy process analysis. It welcomes original papers, review articles, technical notes, and letters to the editor. Authors are encouraged to submit manuscripts that bridge the gap between research, development, and implementation. The journal addresses a wide spectrum of topics, including fossil and renewable energy technologies, energy economics, and environmental impacts. Applied Energy also explores modeling and forecasting, conservation strategies, and the social and economic implications of energy policies, including climate change mitigation. It is complemented by the open-access journal Advances in Applied Energy.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信