{"title":"An intelligent separated zone oil production technology based on electromagnetic coupling principle","authors":"Qinghai YANG ,&nbsp;Chenglong LIAO ,&nbsp;Deli JIA ,&nbsp;Yingjun ZHU ,&nbsp;Chuan YU ,&nbsp;Lingwei KONG ,&nbsp;Yang YU ,&nbsp;Kai DU","doi":"10.1016/S1876-3804(25)60017-6","DOIUrl":null,"url":null,"abstract":"<div><div>To address the challenges associated with existing separated zone oil production technologies, such as incompatibility with pump inspection operations, short effective working life, and poor communication reliability, an innovative electromagnetic coupling intelligent zonal oil production technology has been proposed. The core and accessory tools have been developed and applied in field tests. This technology employs a pipe string structure incorporation a release sub, which separates the production and allocation pipe strings. When the two strings are docked downhole, electromagnetic coupling enables close-range wireless transmission of electrical power and signals between the strings, powering multiple downhole intelligent production allocators (IPAs) and enabling two-way communication. Core tools adapted to the complex working conditions downhole were developed, including downhole electricity &amp; signal transmission equipment based on electromagnetic coupling (EST), IPAs, and ground communication controllers (GCCs). Accessory tools, including large-diameter release sub anchor and cable-crossing packers, have also been technically finalized. Field tests conducted on ten wells in Daqing Oilfield demonstrated that the downhole docking of the two strings was convenient and reliable, and the EST worked stably. Real-time monitoring of flow rate, pressure and temperature in separate layers and regulation of zonal fluid production were also achieved. This technology has enhanced reservoir understanding and achieved practical production results of increased oil output with reduced water cut.</div></div>","PeriodicalId":67426,"journal":{"name":"Petroleum Exploration and Development","volume":"52 1","pages":"Pages 230-244"},"PeriodicalIF":7.0000,"publicationDate":"2025-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Petroleum Exploration and Development","FirstCategoryId":"1087","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1876380425600176","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

To address the challenges associated with existing separated zone oil production technologies, such as incompatibility with pump inspection operations, short effective working life, and poor communication reliability, an innovative electromagnetic coupling intelligent zonal oil production technology has been proposed. The core and accessory tools have been developed and applied in field tests. This technology employs a pipe string structure incorporation a release sub, which separates the production and allocation pipe strings. When the two strings are docked downhole, electromagnetic coupling enables close-range wireless transmission of electrical power and signals between the strings, powering multiple downhole intelligent production allocators (IPAs) and enabling two-way communication. Core tools adapted to the complex working conditions downhole were developed, including downhole electricity & signal transmission equipment based on electromagnetic coupling (EST), IPAs, and ground communication controllers (GCCs). Accessory tools, including large-diameter release sub anchor and cable-crossing packers, have also been technically finalized. Field tests conducted on ten wells in Daqing Oilfield demonstrated that the downhole docking of the two strings was convenient and reliable, and the EST worked stably. Real-time monitoring of flow rate, pressure and temperature in separate layers and regulation of zonal fluid production were also achieved. This technology has enhanced reservoir understanding and achieved practical production results of increased oil output with reduced water cut.
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
11.50
自引率
0.00%
发文量
473
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信