Adaptive time granularity-based coordinated planning method for the electric-hydrogen coupled energy system with hybrid energy storage

IF 5 2区 工程技术 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC
Yixin Liu , Shulong Huang , Li Guo , Ji Li , Zhongguan Wang , Jie Song , Chengshan Wang
{"title":"Adaptive time granularity-based coordinated planning method for the electric-hydrogen coupled energy system with hybrid energy storage","authors":"Yixin Liu ,&nbsp;Shulong Huang ,&nbsp;Li Guo ,&nbsp;Ji Li ,&nbsp;Zhongguan Wang ,&nbsp;Jie Song ,&nbsp;Chengshan Wang","doi":"10.1016/j.ijepes.2025.110540","DOIUrl":null,"url":null,"abstract":"<div><div>The electric-hydrogen coupled system (EHCS) is becoming an important way for renewable energy consumption and energy low-carbon transformation due to its ability of long-term energy transport and short-term power regulation. For the capacity configuration of EHCS, the traditional method with fixed time granularity is difficult to balance the contradiction between model complexity, computational cost and model accuracy. To this end, this paper proposes an adaptive time granularity-based coordinated planning method. Firstly, the seasonal-trend decomposition using losses (STL) algorithm is used to extract the characteristics of intra-day variation and seasonal fluctuation of net loads. On this basis, ward clustering algorithm is applied to realize the vertical typical day selection and horizontal time granulation. The optimal particle number of typical days and seasonal component is determined based on an improved PSO algorithm. Then, a planning model is constructed to determine the capacity of key devices of EHCS, whose results are used in reverse for updating the particle number of PSO algorithm, so that the optimal combination of time granularities can be realized according to the long-term and short-term operational characteristics of different devices. Finally, the effectiveness of the proposed method is verified based on numerous simulation analysis. Compared with the benchmark case based on 8760 h, the average planning error is only 4.52%, while the computation time is reduced by 65.13%, and the average planning error is improved by 10.23% compared with the fixed granularity method.</div></div>","PeriodicalId":50326,"journal":{"name":"International Journal of Electrical Power & Energy Systems","volume":"166 ","pages":"Article 110540"},"PeriodicalIF":5.0000,"publicationDate":"2025-02-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Power & Energy Systems","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0142061525000912","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

The electric-hydrogen coupled system (EHCS) is becoming an important way for renewable energy consumption and energy low-carbon transformation due to its ability of long-term energy transport and short-term power regulation. For the capacity configuration of EHCS, the traditional method with fixed time granularity is difficult to balance the contradiction between model complexity, computational cost and model accuracy. To this end, this paper proposes an adaptive time granularity-based coordinated planning method. Firstly, the seasonal-trend decomposition using losses (STL) algorithm is used to extract the characteristics of intra-day variation and seasonal fluctuation of net loads. On this basis, ward clustering algorithm is applied to realize the vertical typical day selection and horizontal time granulation. The optimal particle number of typical days and seasonal component is determined based on an improved PSO algorithm. Then, a planning model is constructed to determine the capacity of key devices of EHCS, whose results are used in reverse for updating the particle number of PSO algorithm, so that the optimal combination of time granularities can be realized according to the long-term and short-term operational characteristics of different devices. Finally, the effectiveness of the proposed method is verified based on numerous simulation analysis. Compared with the benchmark case based on 8760 h, the average planning error is only 4.52%, while the computation time is reduced by 65.13%, and the average planning error is improved by 10.23% compared with the fixed granularity method.
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Journal of Electrical Power & Energy Systems
International Journal of Electrical Power & Energy Systems 工程技术-工程:电子与电气
CiteScore
12.10
自引率
17.30%
发文量
1022
审稿时长
51 days
期刊介绍: The journal covers theoretical developments in electrical power and energy systems and their applications. The coverage embraces: generation and network planning; reliability; long and short term operation; expert systems; neural networks; object oriented systems; system control centres; database and information systems; stock and parameter estimation; system security and adequacy; network theory, modelling and computation; small and large system dynamics; dynamic model identification; on-line control including load and switching control; protection; distribution systems; energy economics; impact of non-conventional systems; and man-machine interfaces. As well as original research papers, the journal publishes short contributions, book reviews and conference reports. All papers are peer-reviewed by at least two referees.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信