BIM tunneling documentation in Rohbaustollen Angath

Jaka Senekovic, Dario Gaudart, Mag. Frédéric Heil, Roland Arnold, Johannes Krasa
{"title":"BIM tunneling documentation in Rohbaustollen Angath","authors":"Jaka Senekovic,&nbsp;Dario Gaudart,&nbsp;Mag. Frédéric Heil,&nbsp;Roland Arnold,&nbsp;Johannes Krasa","doi":"10.1002/cend.202400039","DOIUrl":null,"url":null,"abstract":"<p>Since 2023, Austrian Federal Railways (ÖBB), with BEMO-ÖSTU STETTIN, has been constructing the 2.6 km raw construction tunnel Angath (Rohbaustollen Angath) along the Angerberg. It will support geological investigations, logistics for the future main railway tunnel Angerberg, and act as a rescue tunnel, ensuring safety. The project includes a pre-cut, tunnel excavation, and a 110-meter section of the main railway tunnel, with turning niches and cross adits. Building information modeling (BIM) is used for design, tendering, control, and documentation. The integrated project delivery (IPD) model ensures shared responsibility for risks and costs. BIM optimizes data flow and transparency, with tunneling documentation collected on-site, verified in ÖBB's Common Data Environment (MSP), and used for parametric modeling. Cost and progress monitoring occur via software RIB iTWO (Version 2023, 2023). Project documentation and the linking of the documentation into a 3D BIM model of a tunnel enables early detection of deviations and appropriate action to be taken, with transparency and traceability being critical to the success of the IPD project.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 4","pages":"150-157"},"PeriodicalIF":0.0000,"publicationDate":"2024-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400039","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Design","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cend.202400039","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Since 2023, Austrian Federal Railways (ÖBB), with BEMO-ÖSTU STETTIN, has been constructing the 2.6 km raw construction tunnel Angath (Rohbaustollen Angath) along the Angerberg. It will support geological investigations, logistics for the future main railway tunnel Angerberg, and act as a rescue tunnel, ensuring safety. The project includes a pre-cut, tunnel excavation, and a 110-meter section of the main railway tunnel, with turning niches and cross adits. Building information modeling (BIM) is used for design, tendering, control, and documentation. The integrated project delivery (IPD) model ensures shared responsibility for risks and costs. BIM optimizes data flow and transparency, with tunneling documentation collected on-site, verified in ÖBB's Common Data Environment (MSP), and used for parametric modeling. Cost and progress monitoring occur via software RIB iTWO (Version 2023, 2023). Project documentation and the linking of the documentation into a 3D BIM model of a tunnel enables early detection of deviations and appropriate action to be taken, with transparency and traceability being critical to the success of the IPD project.

求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信