Tailoring bus rapid transit to the complex realities of African Cities: Critical issues and public policy planning approaches

IF 3.9 Q2 TRANSPORTATION
Emmanuel Theodore Asimeng, Franco Jauregui-Fung
{"title":"Tailoring bus rapid transit to the complex realities of African Cities: Critical issues and public policy planning approaches","authors":"Emmanuel Theodore Asimeng,&nbsp;Franco Jauregui-Fung","doi":"10.1016/j.trip.2025.101351","DOIUrl":null,"url":null,"abstract":"<div><div>Paratransit services in African cities, characterised by reckless driving, unscheduled operations, ageing and small vehicles, tax avoidance, lack of social protection, and irregular worker earnings, account for a significant share of daily trips. To address these challenges, some cities have turned to bus rapid transit (BRT) systems as a more affordable and efficient public transit solution. While 191 cities globally have implemented BRT, only six are in Africa. These African BRT implementations have often been fraught with difficulties, including delays, cost overruns, and operational challenges, while several projects have failed to materialise despite significant public investment. This raises a critical question: why is BRT adoption limited in African cities, despite rapid urbanisation and the inadequacies of paratransit systems? In response to this question, this paper examines three public policy planning concepts commonly applied to BRT projects: rationalist, disjointed incremental, and step-by-step, evaluating their effectiveness and limitations in the African context. Based on this analysis, we propose an approach that aligns more closely with African cities’ unique socioeconomic and transport dynamics. Additionally, we provide strategies for addressing key implementation challenges, such as integrating BRT with existing transport systems, managing stakeholder resistance, and ensuring financial and institutional sustainability. Grounded in a comprehensive review of three BRT case studies and public policy frameworks, this paper offers actionable recommendations to strengthen BRT as a viable solution to urban transport challenges in African cities. We recommend adopting a step-by-step approach that emphasises institutional and legislative restructuring, management of competing transit modes, stepwise implementation of BRT components, and innovative infrastructure funding strategies to ensure the new service’s successful implementation, operation and sustainability.</div></div>","PeriodicalId":36621,"journal":{"name":"Transportation Research Interdisciplinary Perspectives","volume":"30 ","pages":"Article 101351"},"PeriodicalIF":3.9000,"publicationDate":"2025-02-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Research Interdisciplinary Perspectives","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2590198225000302","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 0

Abstract

Paratransit services in African cities, characterised by reckless driving, unscheduled operations, ageing and small vehicles, tax avoidance, lack of social protection, and irregular worker earnings, account for a significant share of daily trips. To address these challenges, some cities have turned to bus rapid transit (BRT) systems as a more affordable and efficient public transit solution. While 191 cities globally have implemented BRT, only six are in Africa. These African BRT implementations have often been fraught with difficulties, including delays, cost overruns, and operational challenges, while several projects have failed to materialise despite significant public investment. This raises a critical question: why is BRT adoption limited in African cities, despite rapid urbanisation and the inadequacies of paratransit systems? In response to this question, this paper examines three public policy planning concepts commonly applied to BRT projects: rationalist, disjointed incremental, and step-by-step, evaluating their effectiveness and limitations in the African context. Based on this analysis, we propose an approach that aligns more closely with African cities’ unique socioeconomic and transport dynamics. Additionally, we provide strategies for addressing key implementation challenges, such as integrating BRT with existing transport systems, managing stakeholder resistance, and ensuring financial and institutional sustainability. Grounded in a comprehensive review of three BRT case studies and public policy frameworks, this paper offers actionable recommendations to strengthen BRT as a viable solution to urban transport challenges in African cities. We recommend adopting a step-by-step approach that emphasises institutional and legislative restructuring, management of competing transit modes, stepwise implementation of BRT components, and innovative infrastructure funding strategies to ensure the new service’s successful implementation, operation and sustainability.
求助全文
约1分钟内获得全文 求助全文
来源期刊
Transportation Research Interdisciplinary Perspectives
Transportation Research Interdisciplinary Perspectives Engineering-Automotive Engineering
CiteScore
12.90
自引率
0.00%
发文量
185
审稿时长
22 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信