Hybrid deep learning model for accurate cost and schedule estimation in construction projects using sequential and non-sequential data

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY
Min-Yuan Cheng, Quoc-Tuan Vu, Frederik Elly Gosal
{"title":"Hybrid deep learning model for accurate cost and schedule estimation in construction projects using sequential and non-sequential data","authors":"Min-Yuan Cheng, Quoc-Tuan Vu, Frederik Elly Gosal","doi":"10.1016/j.autcon.2024.105904","DOIUrl":null,"url":null,"abstract":"Accurate estimation of construction costs and schedules is crucial for optimizing project planning and resource allocation. Most current approaches utilize traditional statistical analysis and machine learning techniques to process the vast amounts of data regularly generated in construction environments. However, these approaches do not adequately capture the intricate patterns in either time-dependent or time-independent data. Thus, a hybrid deep learning model (NN-BiGRU), combining Neural Network (NN) for time-independent and Bidirectional Gated Recurrent Unit (BiGRU) for time-dependent, was developed in this paper to estimate the final cost and schedule to completion of projects. The Optical Microscope Algorithm (OMA) was used to fine-tune the NN-BiGRU model (OMA-NN-BiGRU). The proposed model earned Reference Index (RI) values of 0.977 for construction costs and 0.932 for completion schedules. These findings underscore the potential of the OMA-NN-BiGRU model to provide highly accurate predictions, enabling stakeholders to make informed decisions that promote project efficiency and overall success.","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"12 1","pages":""},"PeriodicalIF":9.6000,"publicationDate":"2024-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1016/j.autcon.2024.105904","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

Accurate estimation of construction costs and schedules is crucial for optimizing project planning and resource allocation. Most current approaches utilize traditional statistical analysis and machine learning techniques to process the vast amounts of data regularly generated in construction environments. However, these approaches do not adequately capture the intricate patterns in either time-dependent or time-independent data. Thus, a hybrid deep learning model (NN-BiGRU), combining Neural Network (NN) for time-independent and Bidirectional Gated Recurrent Unit (BiGRU) for time-dependent, was developed in this paper to estimate the final cost and schedule to completion of projects. The Optical Microscope Algorithm (OMA) was used to fine-tune the NN-BiGRU model (OMA-NN-BiGRU). The proposed model earned Reference Index (RI) values of 0.977 for construction costs and 0.932 for completion schedules. These findings underscore the potential of the OMA-NN-BiGRU model to provide highly accurate predictions, enabling stakeholders to make informed decisions that promote project efficiency and overall success.
利用顺序和非顺序数据的混合深度学习模型,准确估算建筑项目的成本和进度
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信