Will Gorman, Julie Mulvaney Kemp, Joseph Rand, Joachim Seel, Ryan Wiser, Nick Manderlink, Fredrich Kahrl, Kevin Porter, Will Cotton
{"title":"Grid connection barriers to renewable energy deployment in the United States","authors":"Will Gorman, Julie Mulvaney Kemp, Joseph Rand, Joachim Seel, Ryan Wiser, Nick Manderlink, Fredrich Kahrl, Kevin Porter, Will Cotton","doi":"10.1016/j.joule.2024.11.008","DOIUrl":null,"url":null,"abstract":"Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.","PeriodicalId":343,"journal":{"name":"Joule","volume":"1 1","pages":""},"PeriodicalIF":38.6000,"publicationDate":"2024-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Joule","FirstCategoryId":"88","ListUrlMain":"https://doi.org/10.1016/j.joule.2024.11.008","RegionNum":1,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, PHYSICAL","Score":null,"Total":0}
引用次数: 0
Abstract
Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.
期刊介绍:
Joule is a sister journal to Cell that focuses on research, analysis, and ideas related to sustainable energy. It aims to address the global challenge of the need for more sustainable energy solutions. Joule is a forward-looking journal that bridges disciplines and scales of energy research. It connects researchers and analysts working on scientific, technical, economic, policy, and social challenges related to sustainable energy. The journal covers a wide range of energy research, from fundamental laboratory studies on energy conversion and storage to global-level analysis. Joule aims to highlight and amplify the implications, challenges, and opportunities of novel energy research for different groups in the field.