Mobile base station site as a virtual power plant for grid stability

IF 5 2区 工程技术 Q1 ENGINEERING, ELECTRICAL & ELECTRONIC
Jussi Laimio , Mika Keski-Heikkilä , Matti Pärssinen , Roope Lahti , Olli Salmela , Topi Volkov , Jari Collin , Petri Rannikko , Henri Koskela , Jukka Manner
{"title":"Mobile base station site as a virtual power plant for grid stability","authors":"Jussi Laimio ,&nbsp;Mika Keski-Heikkilä ,&nbsp;Matti Pärssinen ,&nbsp;Roope Lahti ,&nbsp;Olli Salmela ,&nbsp;Topi Volkov ,&nbsp;Jari Collin ,&nbsp;Petri Rannikko ,&nbsp;Henri Koskela ,&nbsp;Jukka Manner","doi":"10.1016/j.ijepes.2024.110390","DOIUrl":null,"url":null,"abstract":"<div><div>Energy grids and markets are in transition. Increased use of renewable energy sources (RES) introduces new stability challenges for power grids. Despite the substantial electrical consumption of mobile networks, they are yet to harness their inherent flexibility for aiding in the stability of the power grid. A noticeable research gap exists concerning measuring full activation time for fast frequency reserve (FFR) product while using batteries from mobile network base stations. Our objective is to demonstrate that mobile operators could use their existing infrastructure to participate in the reserve market of a contemporary power grid. Furthermore, it seeks to determine if the full activation time can meet the requirements of an FFR product. The system consists of a live mobile base station site with a mobile connection to the site, local controller, an existing battery, and a power system that, in combination, can function as part of a power grid balancing system. Our main finding indicates that the rectifier reaction time within an installed base station site infrastructure ranges from 5 to 8 s, and the time when the base station is entirely off from the grid varies from 7 to 10 s. This finding is significant since the activation time is too long for the base station power system controller to be used for FFR. The required full activation time for FFR is less than 1.3 s. In conclusion, power system vendors should investigate improvements for their equipment and software products to enable fast reserve market entry for their existing customers and stay competitive.</div></div>","PeriodicalId":50326,"journal":{"name":"International Journal of Electrical Power & Energy Systems","volume":"164 ","pages":"Article 110390"},"PeriodicalIF":5.0000,"publicationDate":"2024-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Power & Energy Systems","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0142061524006136","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

Energy grids and markets are in transition. Increased use of renewable energy sources (RES) introduces new stability challenges for power grids. Despite the substantial electrical consumption of mobile networks, they are yet to harness their inherent flexibility for aiding in the stability of the power grid. A noticeable research gap exists concerning measuring full activation time for fast frequency reserve (FFR) product while using batteries from mobile network base stations. Our objective is to demonstrate that mobile operators could use their existing infrastructure to participate in the reserve market of a contemporary power grid. Furthermore, it seeks to determine if the full activation time can meet the requirements of an FFR product. The system consists of a live mobile base station site with a mobile connection to the site, local controller, an existing battery, and a power system that, in combination, can function as part of a power grid balancing system. Our main finding indicates that the rectifier reaction time within an installed base station site infrastructure ranges from 5 to 8 s, and the time when the base station is entirely off from the grid varies from 7 to 10 s. This finding is significant since the activation time is too long for the base station power system controller to be used for FFR. The required full activation time for FFR is less than 1.3 s. In conclusion, power system vendors should investigate improvements for their equipment and software products to enable fast reserve market entry for their existing customers and stay competitive.
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Journal of Electrical Power & Energy Systems
International Journal of Electrical Power & Energy Systems 工程技术-工程:电子与电气
CiteScore
12.10
自引率
17.30%
发文量
1022
审稿时长
51 days
期刊介绍: The journal covers theoretical developments in electrical power and energy systems and their applications. The coverage embraces: generation and network planning; reliability; long and short term operation; expert systems; neural networks; object oriented systems; system control centres; database and information systems; stock and parameter estimation; system security and adequacy; network theory, modelling and computation; small and large system dynamics; dynamic model identification; on-line control including load and switching control; protection; distribution systems; energy economics; impact of non-conventional systems; and man-machine interfaces. As well as original research papers, the journal publishes short contributions, book reviews and conference reports. All papers are peer-reviewed by at least two referees.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信