Geological risk assessment of traffic engineering construction among 7.0–8.5 magnitude earthquake areas: Practice from the Sichuan-Tibet transport corridor in the eastern Tibetan Plateau

IF 4.6 3区 地球科学 Q1 GEOSCIENCES, MULTIDISCIPLINARY
China Geology Pub Date : 2024-10-25 DOI:10.31035/cg2023055
Ning Zhong , Xian-bing Zhang , Chang-bao Guo , Zhen Yang , Hao Yu , Rui-an Wu , Yang Wang , Hai-bing Li
{"title":"Geological risk assessment of traffic engineering construction among 7.0–8.5 magnitude earthquake areas: Practice from the Sichuan-Tibet transport corridor in the eastern Tibetan Plateau","authors":"Ning Zhong ,&nbsp;Xian-bing Zhang ,&nbsp;Chang-bao Guo ,&nbsp;Zhen Yang ,&nbsp;Hao Yu ,&nbsp;Rui-an Wu ,&nbsp;Yang Wang ,&nbsp;Hai-bing Li","doi":"10.31035/cg2023055","DOIUrl":null,"url":null,"abstract":"<div><div>At least 13 active fault zones have developed in the Ya’an-Linzhi section of the Sichuan-Tibet transport corridor, and there have been undergone 17 <em>M</em><sub>S</sub> ≥ 7.0 earthquakes, the largest earthquake is 1950 Chayu <em>M</em><sub>S</sub> 8.5 earthquake, which has very strong seismic activity. Therefore, carrying out engineering construction in the Sichuan-Tibet transport corridor is a huge challenge for geological technological personnel. To determining the spatial geometric distribution, activity of active faults and geological safety risk in the Sichuan-Tibet transport corridor. Based on remote sensing images, ground surveys, and chronological tests, as well as the deep geophysical and current GPS data, we investigated the geometry, segmentation, and paleoearthquake history of five major active fault zones in the Ya’an-Linzhi section of the Sichuan-Tibet transport corridor, namely the Xianshuihe, Litang, Batang, Jiali-Chayu and Lulang-Yigong. The five major fault zones are all Holocene active faults, which contain strike-slip components as well as thrust or normal fault components, and contain multiple branch faults. The Selaha-Kangding segment of the Xianshuihe fault zone, the Maoyaba and Litang segment of the Litang fault zone, the middle segment (Yigong-Tongmai-Bomi) of Jiali-Chayu fault zone and Lulang-Yigong fault zone have the risk of experiencing strong earthquakes in the future, with a high possibility of the occurrence of <em>M</em><sub>S</sub> ≥ 7.0 earthquakes. The Jinsha River and the Palong-Zangbu River, which is a high-risk area for geological hazard chain risk in the Ya’an-Linzhi section of the Sichuan-Tibet transport corridor. Construction and safe operation Ya’an-Linzhi section of the Sichuan-Tibet transport corridor, need strengthen analysis the current crustal deformation, stress distribution and fault activity patterns, clarify active faults relationship with large earthquakes, and determine the potential maximum magnitude, epicenters, and risk range. This study provides basic data for understanding the activity, seismicity, and tectonic deformation patterns of the regional faults in the Sichuan-Tibet transport corridor.</div></div>","PeriodicalId":45329,"journal":{"name":"China Geology","volume":"7 4","pages":"Pages 605-629"},"PeriodicalIF":4.6000,"publicationDate":"2024-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"China Geology","FirstCategoryId":"89","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2096519224001356","RegionNum":3,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

At least 13 active fault zones have developed in the Ya’an-Linzhi section of the Sichuan-Tibet transport corridor, and there have been undergone 17 MS ≥ 7.0 earthquakes, the largest earthquake is 1950 Chayu MS 8.5 earthquake, which has very strong seismic activity. Therefore, carrying out engineering construction in the Sichuan-Tibet transport corridor is a huge challenge for geological technological personnel. To determining the spatial geometric distribution, activity of active faults and geological safety risk in the Sichuan-Tibet transport corridor. Based on remote sensing images, ground surveys, and chronological tests, as well as the deep geophysical and current GPS data, we investigated the geometry, segmentation, and paleoearthquake history of five major active fault zones in the Ya’an-Linzhi section of the Sichuan-Tibet transport corridor, namely the Xianshuihe, Litang, Batang, Jiali-Chayu and Lulang-Yigong. The five major fault zones are all Holocene active faults, which contain strike-slip components as well as thrust or normal fault components, and contain multiple branch faults. The Selaha-Kangding segment of the Xianshuihe fault zone, the Maoyaba and Litang segment of the Litang fault zone, the middle segment (Yigong-Tongmai-Bomi) of Jiali-Chayu fault zone and Lulang-Yigong fault zone have the risk of experiencing strong earthquakes in the future, with a high possibility of the occurrence of MS ≥ 7.0 earthquakes. The Jinsha River and the Palong-Zangbu River, which is a high-risk area for geological hazard chain risk in the Ya’an-Linzhi section of the Sichuan-Tibet transport corridor. Construction and safe operation Ya’an-Linzhi section of the Sichuan-Tibet transport corridor, need strengthen analysis the current crustal deformation, stress distribution and fault activity patterns, clarify active faults relationship with large earthquakes, and determine the potential maximum magnitude, epicenters, and risk range. This study provides basic data for understanding the activity, seismicity, and tectonic deformation patterns of the regional faults in the Sichuan-Tibet transport corridor.
7.0-8.5 级地震区交通工程建设地质风险评估:来自青藏高原东部川藏交通走廊的实践
川藏交通走廊雅安至林芝段至少发育了 13 条活动断裂带,发生过 17 次 MS≥7.0 级地震,最大地震为 1950 年察隅 MS 8.5 级地震,地震活动性极强。因此,在川藏交通走廊进行工程建设,对地质技术人员来说是一个巨大的挑战。为确定川藏交通走廊活动断层的空间几何分布、活动性及地质安全风险。基于遥感影像、地面调查和年代学测试,以及深部地球物理和当前 GPS 数据,我们研究了川藏交通走廊雅安至林芝段的五大活动断裂带,即咸水河段、理塘段、巴塘段、嘉黎至察隅段和鲁朗至宜贡段的几何形状、断裂分段和古地震历史。这五大断层带均为全新世活动断层,其中既有走向滑动断层,也有推覆断层或正断层,并包含多个分支断层。仙水河断裂带的色拉哈-康定段、理塘断裂带的毛家坝-理塘段、嘉黎-察右断裂带的中段(宜工-通麦-波密)和鲁朗-宜工断裂带未来有发生强震的危险,发生 MS≥7.0 地震的可能性较大。金沙江和帕隆藏布江,是川藏交通走廊雅安至林芝段地质灾害连锁风险高发区。川藏交通走廊雅安至林芝段的建设和安全运行,需要加强对当前地壳变形、应力分布和断层活动规律的分析,明确活动断层与大地震的关系,确定潜在的最大震级、震中和危险范围。本研究为了解川藏交通走廊区域断层的活动性、地震性和构造变形规律提供了基础数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
China Geology
China Geology GEOLOGY-
CiteScore
7.80
自引率
11.10%
发文量
275
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信