Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective

IF 1.2 Q3 BUSINESS, FINANCE
Dickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye, Prince Asher Nkrumah
{"title":"Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective","authors":"Dickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye, Prince Asher Nkrumah","doi":"10.1108/jfmpc-07-2023-0044","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery. Moreover, PPP project stakeholders have inadequate information about the probable impacts of time-based delay imposed on PPP projects under the PPP arrangement. This study aims to identify and categorize construction stakeholders’ perceptions of the impact of time-based delays on PPP construction projects.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>A purposive sampling technique was adopted where questionnaires were used as the primary instrument for gathering data from PPP experts. Cronbach’s alpha coefficient and Kendall’s concordance were used to measure the reliability of the scale and the respondent’s level of agreement, respectively. One sample <em>t</em>-test, mean score ranking and principal component analysis were used to analyse the identified time-based delay impacts.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>The study revealed seven significant impacts of time-based delay on PPP construction project delivery as: “project schedule overrun”, “idling of project resources”, “project cost overrun”, “poor quality of completed works”, “delayed realization of project benefits”, “frequent arbitration/litigation in PPP projects” and “total abandonment of PPP projects”. The study further identified the top five significant impacts of time-based delay on PPP project stakeholders as: “reduction in motivation to attract investment”, “high interest on finance (loans)”, “contractor in financial crisis”, “loss of public confidence in government” and “reduction in parties’ reputation”.</p><!--/ Abstract__block -->\n<h3>Practical implications</h3>\n<p>The identified significant impacts of time-based delays will increase stakeholders’ awareness of the repercussions and effects that time-based delays may impose on PPP construction projects if not appropriately managed throughout the project implementation. This awareness will further guide stakeholders to implement targeted risk management strategies to minimize the negative consequences of delays on PPP project performance.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>As a pioneering study that provides a better understanding of the impacts of time-based delays on PPP construction projects, this study enhances knowledge of PPP construction project implementation.</p><!--/ Abstract__block -->","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"121 1","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2024-08-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-07-2023-0044","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery. Moreover, PPP project stakeholders have inadequate information about the probable impacts of time-based delay imposed on PPP projects under the PPP arrangement. This study aims to identify and categorize construction stakeholders’ perceptions of the impact of time-based delays on PPP construction projects.

Design/methodology/approach

A purposive sampling technique was adopted where questionnaires were used as the primary instrument for gathering data from PPP experts. Cronbach’s alpha coefficient and Kendall’s concordance were used to measure the reliability of the scale and the respondent’s level of agreement, respectively. One sample t-test, mean score ranking and principal component analysis were used to analyse the identified time-based delay impacts.

Findings

The study revealed seven significant impacts of time-based delay on PPP construction project delivery as: “project schedule overrun”, “idling of project resources”, “project cost overrun”, “poor quality of completed works”, “delayed realization of project benefits”, “frequent arbitration/litigation in PPP projects” and “total abandonment of PPP projects”. The study further identified the top five significant impacts of time-based delay on PPP project stakeholders as: “reduction in motivation to attract investment”, “high interest on finance (loans)”, “contractor in financial crisis”, “loss of public confidence in government” and “reduction in parties’ reputation”.

Practical implications

The identified significant impacts of time-based delays will increase stakeholders’ awareness of the repercussions and effects that time-based delays may impose on PPP construction projects if not appropriately managed throughout the project implementation. This awareness will further guide stakeholders to implement targeted risk management strategies to minimize the negative consequences of delays on PPP project performance.

Originality/value

As a pioneering study that provides a better understanding of the impacts of time-based delays on PPP construction projects, this study enhances knowledge of PPP construction project implementation.

基于时间的延迟对公私合作(PPP)建筑项目交付的影响:建筑利益相关者的观点
目的 由于项目交付的相关风险不确定,许多投资者对投标公私合作建设项目的兴趣不 大。此外,公私營機構合作項目持份者對於在公私營機構合作安排下,按時延誤對公私營機構合作項目可能造成的影響,亦缺乏足夠的資料。本研究旨在确定建筑利益相关者对基于时间的延迟对 PPP 建筑项目的影响的看法,并对其进行分类。采用目的性抽样技术,以调查问卷为主要工具,从 PPP 专家那里收集数据。Cronbach's alpha 系数和 Kendall's concordance 分别用于测量量表的可靠性和受访者的同意程度。采用单样本 t 检验、平均分排序和主成分分析法对已识别的基于时间的延迟影响进行了分析:"项目进度超支"、"项目资源闲置"、"项目成本超支"、"竣工工程质量差"、"项目效益实现延迟"、"PPP项目仲裁/诉讼频繁 "和 "完全放弃PPP项目"。研究进一步确定了基于时间的延误对 PPP 项目利益相关者的五大重大影响,分别是"实际影响已确定的基于时间的延误的重大影响将提高利益相关者对基于时间的延误可能对 PPP 建设项目造成的反响和影响的认识,如果在整个项目实施过程中不加以适当管理的话。作为一项开创性的研究,本研究为更好地理解基于时间的延误对 PPP 建筑项目的影响提供了思路,从而增进了对 PPP 建筑项目实施的了解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信