Method for Evaluation of the Energy Potential and Sizing of the Works of a Hydroenergy Site for the Establishment of a Mini-Hydroelectric Power Plant. Application : Tinkisso 2 Site in Dabola in the Republic of Guinea

Yacouba Camara, Oumar Keita, Mamadou Dian KANTE
{"title":"Method for Evaluation of the Energy Potential and Sizing of the Works of a Hydroenergy Site for the Establishment of a Mini-Hydroelectric Power Plant. Application : Tinkisso 2 Site in Dabola in the Republic of Guinea","authors":"Yacouba Camara, Oumar Keita, Mamadou Dian KANTE","doi":"10.52403/ijrr.20240812","DOIUrl":null,"url":null,"abstract":"The objective of this research concerns the evaluation of the energy potential and the sizing of the Tinkisso 2 hydro-energy site for the establishment of a hydroelectric power plant serving as an additional source to the existing power plant (1.65MW) for service. in electricity for the town of Dabola and its surrounding areas which currently have a need of 7MW. The methodology adopted for this study is that initiated by the Decentralized Rural Electrification Office (BERD), which consists of evaluating the potential by measuring hydrological and energy parameters using topographical tools such as: the telescope on a tripod, the GPS, graduated ruler, tape measure, float, etc. These parameters allowed us to choose the electromechanical equipment adaptable to the installation site of the hydroelectric power station and the determination of the dimensions of the loading basin.\nAt the end of this study, we obtained the following results:\nFor the evaluation of the potential: the available flow (41.81 m3/s), the reserved flow (3.35 m3/s), the equipment flow (38.26 m3/s), the gross head (45m), gross power (16.889 MW), net head (40.5m), useful power (11.628 MW);\nFor sizing: the diameter of the penstock (550 cm), the type of turbine is Francis, the frequency of the turbine (100 rpm), the type of generator is vertical synchronous, the number of groups (2) , the efficiency coefficient of the generator (96.1%), the length of the active steel of the stator (33 cm), the power of the chosen transformer (10 MW), the weight of the transformer (23.8 tonnes), the output voltage (35 kV), the length of the charging basin (44 m), the width (27.5 m) and the height (16.5 m).\nThe calculated installed power was compared to that of another study which led to a difference of almost 10%.\n\nKeywords: Evaluation, energy potential, sizing, equipment, power plant, Guinea.","PeriodicalId":504363,"journal":{"name":"International Journal of Research and Review","volume":"69 16","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Research and Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52403/ijrr.20240812","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The objective of this research concerns the evaluation of the energy potential and the sizing of the Tinkisso 2 hydro-energy site for the establishment of a hydroelectric power plant serving as an additional source to the existing power plant (1.65MW) for service. in electricity for the town of Dabola and its surrounding areas which currently have a need of 7MW. The methodology adopted for this study is that initiated by the Decentralized Rural Electrification Office (BERD), which consists of evaluating the potential by measuring hydrological and energy parameters using topographical tools such as: the telescope on a tripod, the GPS, graduated ruler, tape measure, float, etc. These parameters allowed us to choose the electromechanical equipment adaptable to the installation site of the hydroelectric power station and the determination of the dimensions of the loading basin. At the end of this study, we obtained the following results: For the evaluation of the potential: the available flow (41.81 m3/s), the reserved flow (3.35 m3/s), the equipment flow (38.26 m3/s), the gross head (45m), gross power (16.889 MW), net head (40.5m), useful power (11.628 MW); For sizing: the diameter of the penstock (550 cm), the type of turbine is Francis, the frequency of the turbine (100 rpm), the type of generator is vertical synchronous, the number of groups (2) , the efficiency coefficient of the generator (96.1%), the length of the active steel of the stator (33 cm), the power of the chosen transformer (10 MW), the weight of the transformer (23.8 tonnes), the output voltage (35 kV), the length of the charging basin (44 m), the width (27.5 m) and the height (16.5 m). The calculated installed power was compared to that of another study which led to a difference of almost 10%. Keywords: Evaluation, energy potential, sizing, equipment, power plant, Guinea.
为建立小型水力发电厂而对水力发电场的能源潜力和工程规模进行评估的方法。应用:几内亚共和国达博拉的 Tinkisso 2 遗址
本研究的目的是评估 Tinkisso 2 号水电站的能源潜力和规模,以建立一座水电站,作为现有电站(1.65 兆瓦)的补充,为目前需要 7 兆瓦电力的达博拉镇及其周边地区提供服务。这项研究采用的方法是分散式农村电气化办公室 (BERD) 首创的方法,包括通过使用地形工具测量水文和能源参数来评估潜力,这些工具包括:三脚架上的望远镜、全球定位系统、刻度尺、卷尺、浮标等。通过这些参数,我们可以选择与水电站安装地点相适应的机电设备,并确定装载水池的尺寸。研究结束时,我们获得了以下结果:潜力评估:可用流量(41.81 立方米/秒)、预留流量(3.35 立方米/秒)、设备流量(38.26 立方米/秒)、总水头(45 米)、总功率(16.889 兆瓦)、净水头(40.5 米)、有用功率(11.628 兆瓦);水电站选址:水电站选址(4.5 米)、水电站选址(4.5 米)、水电站选址(4.5 米)、水电站选址(4.5 米)、水电站选址(4.5 米)、水电站选址(4.5 米)、水电站选址(4.5 米)、水电站选址(4.5 米)。628 MW);选型方面:水闸直径(550 厘米),水轮机类型为混流式,水轮机频率(100 转/分),发电机类型为立式同步,发电机组数(2),发电机效率系数(96.计算得出的装机功率与另一项研究的结果进行了比较,两者相差近 10%:评估、能源潜力、规模、设备、发电厂、几内亚。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信