Evaluating the Competitiveness of the Methods of Bored Cast-in-Place Piles Underreaming when Constructing the Foundations of Multistorey Buildings

S. G. Osmanov, A. E. Inyakhin
{"title":"Evaluating the Competitiveness of the Methods of Bored Cast-in-Place Piles Underreaming when Constructing the Foundations of Multistorey Buildings","authors":"S. G. Osmanov, A. E. Inyakhin","doi":"10.23947/2949-1835-2024-3-2-33-41","DOIUrl":null,"url":null,"abstract":"Introduction. The bored сast-in-place piles are the type of piles most adjusted to specifics of the multistorey building construction. The article studies the existing methods of underreaming such piles as the main tool to minimise their diameter, length, and quantity, thus optimise and reduce the cost of foundation design and its subsequent construction. It is acknowledged that despite the diversity of these methods, the information about them is scattered, confusing, and sometimes contradictory, making it difficult to choose the optimal design solutions. To facilitate the choice, an application-oriented classification of the methods under study has been proposed aiming to specify the areas of rational implementation thereof.Materials and Methods. The study took into account the data of the guidebooks on norms of production and estimate norms, the reference, normative and standard design documentation, as well as national practices and solutions proposed by the professional subcontracting organisations.  Upon analysis of the above materials, the information on the advantages, disadvantages and implementation area parameters of the existing methods of bored cast-in-place piles underreaming was systematised based on the internal and external factor criteria used for selecting the appropriate solutions in the competitive conditions of multistorey building construction. The competitiveness of three most advanced of such methods was investigated by a comprehensive (multi-criteria) evaluation method. Results. It was found that under general conditions that were studied, the most competitive among the selected methods was mainly the pulse-discharging treatment of a pile shaft and (or) pile base. The respective results were presented graphically in the form of the bar charts of unit labour costs and costs of underreaming by the studied method, as well as the radial bar charts showing the cumulative effect of these and other taken into account parameters on solving the set task of optimisation. Discussion and Conclusion. The reflections upon the efficiency of implementing the obtained results in the present-day designing have been further evolved, and the ways and circumstances of changing thereof depending on the project specification and local conditions of construction have been presented. On the whole, that allowed for specifying the areas of rational implementation of the studied methods and providing the recommendations on updating the relevant regulatory framework.","PeriodicalId":446647,"journal":{"name":"Modern Trends in Construction, Urban and Territorial Planning","volume":" 7","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modern Trends in Construction, Urban and Territorial Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23947/2949-1835-2024-3-2-33-41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction. The bored сast-in-place piles are the type of piles most adjusted to specifics of the multistorey building construction. The article studies the existing methods of underreaming such piles as the main tool to minimise their diameter, length, and quantity, thus optimise and reduce the cost of foundation design and its subsequent construction. It is acknowledged that despite the diversity of these methods, the information about them is scattered, confusing, and sometimes contradictory, making it difficult to choose the optimal design solutions. To facilitate the choice, an application-oriented classification of the methods under study has been proposed aiming to specify the areas of rational implementation thereof.Materials and Methods. The study took into account the data of the guidebooks on norms of production and estimate norms, the reference, normative and standard design documentation, as well as national practices and solutions proposed by the professional subcontracting organisations.  Upon analysis of the above materials, the information on the advantages, disadvantages and implementation area parameters of the existing methods of bored cast-in-place piles underreaming was systematised based on the internal and external factor criteria used for selecting the appropriate solutions in the competitive conditions of multistorey building construction. The competitiveness of three most advanced of such methods was investigated by a comprehensive (multi-criteria) evaluation method. Results. It was found that under general conditions that were studied, the most competitive among the selected methods was mainly the pulse-discharging treatment of a pile shaft and (or) pile base. The respective results were presented graphically in the form of the bar charts of unit labour costs and costs of underreaming by the studied method, as well as the radial bar charts showing the cumulative effect of these and other taken into account parameters on solving the set task of optimisation. Discussion and Conclusion. The reflections upon the efficiency of implementing the obtained results in the present-day designing have been further evolved, and the ways and circumstances of changing thereof depending on the project specification and local conditions of construction have been presented. On the whole, that allowed for specifying the areas of rational implementation of the studied methods and providing the recommendations on updating the relevant regulatory framework.
评估钻孔灌注桩暗挖法在多层建筑地基施工中的竞争力
简介钻孔灌注桩是最适合多层建筑施工的一种桩型。文章研究了现有的钻孔灌注桩方法,这些方法主要是为了尽量减少桩的直径、长度和数量,从而优化并降低地基设计和后续施工的成本。尽管这些方法多种多样,但相关信息分散、混乱,有时甚至相互矛盾,因此很难选择最佳设计方案。为了便于选择,我们对所研究的方法提出了以应用为导向的分类,旨在明确合理实施这些方法的领域。研究参考了生产规范和估算规范指导手册中的数据,参考、规范和标准设计文件,以及国家实践和专业分包组织提出的解决方案。 在对上述材料进行分析后,根据在多层建筑施工的竞争条件下选择适当解决方案的内部和外部因素标准,对现有钻孔灌注桩暗挖方法的优缺点和实施区域参数信息进行了系统化。通过综合(多标准)评估方法,对其中三种最先进方法的竞争力进行了研究。结果发现研究发现,在所研究的一般条件下,所选方法中最具竞争力的主要是对桩轴和(或)桩基进行脉冲放电处理。相关结果以柱状图的形式展示,其中包括单位人工成本和所研究方法的暗挖成本,以及显示这些参数和其他已考虑参数对解决既定优化任务的累积影响的径向柱状图。讨论和结论。对在当今设计中实施所获成果的效率的思考得到了进一步发展,并介绍了根据项目规格和当地施工条件改变其的方法和情况。总体而言,这有助于明确合理实施所研究方法的领域,并就更新相关监管框架提出建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信