Integrating Demand Response with Unit Commitment in Insular Microgrid considering Forecasting Errors and Battery Storage

IF 1.9 4区 工程技术 Q3 ENGINEERING, ELECTRICAL & ELECTRONIC
Rekha Swami, Sunil Kumar Gupta, R. C. Bansal
{"title":"Integrating Demand Response with Unit Commitment in Insular Microgrid considering Forecasting Errors and Battery Storage","authors":"Rekha Swami,&nbsp;Sunil Kumar Gupta,&nbsp;R. C. Bansal","doi":"10.1155/2024/8100507","DOIUrl":null,"url":null,"abstract":"<div>\n <p>In this paper, DR programs are integrated with the unit commitment economic dispatch model for a single day to lower total operating costs for an insular microgrid. The proposed model takes into account the forecasting errors associated with wind, solar, and load demands. A new combined DR program is presented to enhance microgrid operation and financial effectiveness, benefiting microgrid consumers. The price elasticity and consumer profit are the foundation for DR modeling. The optimization problem is developed as mixed-integer nonlinear programming (MINLP) and solved using GAMS software. For the case study, an insular microgrid consisting of two microturbines, a wind turbine, solar photovoltaic, and battery storage is considered. Optimization is carried out under both with and without the DR program. The outcomes show that by implementing TOU and DLC DR programs, the operating cost is reduced by 13.55% and 9.68%, respectively. While consumers experience a financial loss in TOU-DR, they earn profit in DLC-DR. Therefore, a combination of the two, i.e., TOU + DLC DR, is proposed, reducing operating costs by 10.73% while increasing profit for users. The suggested approach benefits the microgrid operator as well as its users, encouraging the construction and operation of insular microgrids in rural or isolated areas.</p>\n </div>","PeriodicalId":51293,"journal":{"name":"International Transactions on Electrical Energy Systems","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2024-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1155/2024/8100507","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Transactions on Electrical Energy Systems","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1155/2024/8100507","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

In this paper, DR programs are integrated with the unit commitment economic dispatch model for a single day to lower total operating costs for an insular microgrid. The proposed model takes into account the forecasting errors associated with wind, solar, and load demands. A new combined DR program is presented to enhance microgrid operation and financial effectiveness, benefiting microgrid consumers. The price elasticity and consumer profit are the foundation for DR modeling. The optimization problem is developed as mixed-integer nonlinear programming (MINLP) and solved using GAMS software. For the case study, an insular microgrid consisting of two microturbines, a wind turbine, solar photovoltaic, and battery storage is considered. Optimization is carried out under both with and without the DR program. The outcomes show that by implementing TOU and DLC DR programs, the operating cost is reduced by 13.55% and 9.68%, respectively. While consumers experience a financial loss in TOU-DR, they earn profit in DLC-DR. Therefore, a combination of the two, i.e., TOU + DLC DR, is proposed, reducing operating costs by 10.73% while increasing profit for users. The suggested approach benefits the microgrid operator as well as its users, encouraging the construction and operation of insular microgrids in rural or isolated areas.

Abstract Image

考虑到预测误差和电池存储,在岛外微电网中将需求响应与机组指令相结合
在本文中,DR 计划与单日机组承诺经济调度模型相结合,以降低岛屿微电网的总运营成本。建议的模型考虑了与风能、太阳能和负荷需求相关的预测误差。提出了一种新的联合 DR 方案,以提高微电网的运行和财务效益,使微电网消费者受益。价格弹性和消费者利润是建立 DR 模型的基础。优化问题以混合整数非线性编程(MINLP)的形式提出,并使用 GAMS 软件求解。在案例研究中,考虑了一个由两台微型涡轮机、一台风力涡轮机、太阳能光伏发电和电池储能组成的孤岛微电网。在有 DR 计划和没有 DR 计划的情况下都进行了优化。结果显示,通过实施 TOU 和 DLC DR 计划,运营成本分别降低了 13.55% 和 9.68%。虽然消费者在 TOU-DR 中遭受了经济损失,但在 DLC-DR 中却获得了利润。因此,建议将两者结合起来,即 TOU + DLC DR,在增加用户利润的同时将运营成本降低 10.73%。所建议的方法既有利于微电网运营商,也有利于其用户,鼓励在农村或偏远地区建设和运营孤岛式微电网。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Transactions on Electrical Energy Systems
International Transactions on Electrical Energy Systems ENGINEERING, ELECTRICAL & ELECTRONIC-
CiteScore
6.70
自引率
8.70%
发文量
342
期刊介绍: International Transactions on Electrical Energy Systems publishes original research results on key advances in the generation, transmission, and distribution of electrical energy systems. Of particular interest are submissions concerning the modeling, analysis, optimization and control of advanced electric power systems. Manuscripts on topics of economics, finance, policies, insulation materials, low-voltage power electronics, plasmas, and magnetics will generally not be considered for review.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信