{"title":"Assessing the reconstruction process following a wildland urban interface (WUI) fire in Viña del Mar, Chile","authors":"Jorge León, María Ignacia Rojas, Soraya Gutiérrez, Randy Román","doi":"10.1108/dpm-12-2023-0323","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>To critically assess the reconstruction process's outcomes four months after a wildfire disaster in Viña del Mar, Chile, comparing the governmental reconstruction plan and the actual rebuilding efforts by the dwellers.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>A geographic information system (GIS)-based analysis to deliver a spatial-based comparison of (1) the cadastre of damaged dwellings; (2) the Ministry of Housing and Urbanism’s (MINVU) reconstruction plan and (3) the actual reconstruction that has been carried out by the dwellers themselves up to November 2023 (as surveyed through fieldwork and drone flights).</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>Around 307 dwellings (97.7% of the 314 examined households) had been rebuilt by November 2023, all through the dwellers’ self-reconstruction efforts, except for two houses delivered by MINVU. Around 105 of these dwellings (34.2%) were granted a reconstruction subsidy by MINVU, while 155 (49.4% of the sample of 314 dwellings) were rebuilt without this aid. Also, 47 houses were rebuilt by dwellers in areas deemed “non-rebuildable” due to their high-risk levels.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>We use a mixed-methods approach to examine disruptions between planned reconstruction and actual rebuilding processes following a wildfire disaster in areas with significant informality.</p><!--/ Abstract__block -->","PeriodicalId":47687,"journal":{"name":"Disaster Prevention and Management","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2024-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Disaster Prevention and Management","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.1108/dpm-12-2023-0323","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose

To critically assess the reconstruction process's outcomes four months after a wildfire disaster in Viña del Mar, Chile, comparing the governmental reconstruction plan and the actual rebuilding efforts by the dwellers.

Design/methodology/approach

A geographic information system (GIS)-based analysis to deliver a spatial-based comparison of (1) the cadastre of damaged dwellings; (2) the Ministry of Housing and Urbanism’s (MINVU) reconstruction plan and (3) the actual reconstruction that has been carried out by the dwellers themselves up to November 2023 (as surveyed through fieldwork and drone flights).

Findings

Around 307 dwellings (97.7% of the 314 examined households) had been rebuilt by November 2023, all through the dwellers’ self-reconstruction efforts, except for two houses delivered by MINVU. Around 105 of these dwellings (34.2%) were granted a reconstruction subsidy by MINVU, while 155 (49.4% of the sample of 314 dwellings) were rebuilt without this aid. Also, 47 houses were rebuilt by dwellers in areas deemed “non-rebuildable” due to their high-risk levels.

Originality/value

We use a mixed-methods approach to examine disruptions between planned reconstruction and actual rebuilding processes following a wildfire disaster in areas with significant informality.

评估智利比尼亚德尔马荒地城市界面(WUI)火灾后的重建过程
目的批判性地评估智利比尼亚德尔马市野火灾害发生四个月后的重建进程成果,比较政府的重建计划和居民的实际重建努力。设计/方法/途径基于地理信息系统(GIS)的分析,对(1)受损住宅的地籍;(2)住房和城市化部(MINVU)的重建计划;(3)截至 2023 年 11 月居民自己开展的实际重建工作(通过实地考察和无人机飞行调查)进行空间比较。调查结果截至 2023 年 11 月,除了两栋由联合国驻阿富汗特派团(MINVU)交付的房屋外,约有 307 栋房屋(占 314 户受访家庭的 97.7%)已经重建,全部由居民自行重建。其中约 105 栋房屋(占 34.2%)获得了联合国住房部的重建补贴,155 栋房屋(占抽样调查的 314 栋房屋的 49.4%)没有获得重建补贴。此外,有 47 栋房屋是由位于因高风险而被视为 "不可重建 "地区的居民重建的。 原创性/价值 我们采用混合方法研究了在非正规性严重的地区发生野火灾害后,计划重建与实际重建过程之间的干扰。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.40
自引率
10.50%
发文量
40
期刊介绍: Disaster Prevention and Management, An International Journal, sets out to advance the available knowledge in the fields of disaster prevention and management and to act as an integrative agent for extant methodologies and activities relating to disaster emergency and crisis management. Publishing high quality, refereed papers, the journal supports the exchange of ideas, experience and practice between academics, practitioners and policy-makers.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信