Simona Koreňová, Monika Šulc Michalková, Zdeněk Máčka, Ronald Pöppl, Jan Donoval
{"title":"Linking sediment connectivity with sediment transport risk assessment in small forested catchments in the Czech Republic","authors":"Simona Koreňová, Monika Šulc Michalková, Zdeněk Máčka, Ronald Pöppl, Jan Donoval","doi":"10.1002/rra.4295","DOIUrl":null,"url":null,"abstract":"Steep mountain environments are typically characterized by high sediment production. In the case of high hillslope–channel connectivity, high production and intensive transport of sediments are problematic and can cause damage in inhabited areas. At the end of the 19th century, due to flood events, large‐scale torrent control measures were inappropriately applied, disrupting the natural processes, and riparian and water ecosystems in watersheds. Connectivity in watersheds affects the course and magnitude of hazards that threaten human society. This is also why the topic of connectivity should be considered in the management of watercourses. Our study links the issue of sediment connectivity (lateral/longitudinal) and the sediment transport‐related risk in unmeasured forested watersheds Hučivá Desná and Upper Moravice. We applied a methodology for sediment transport‐related risk assessment and the well‐established effective catchment area (ECA) approach and connectivity index (IC) to two headwater streams. The results showed the parts of the streams with the highest degree of hazard related to sediment transport and sediment contribution areas connected to them. Based on the field survey, it was found that the best suitable threshold for ECA delineation for Hučivá Desná catchments is 8° and for Upper Moravice is 10°. Area of sediment contribution areas for Hučivá Desná is four times bigger than for Upper Moravice. The Hučiva Desná, therefore, has a higher potential sediment supply from the slopes, which also increases the possibility of occurrence of hazards associated with the sediment transport regime. All three applied methods confirmed that the parallel roads along channels decrease slope–channel connectivity, especially in the Upper Moravice catchment. The combination of methodologies created a suitable tool to identify the most problematic stretches of streams in terms of sediment connectivity and risk related to sediment transport, which can be useful for water and sediment management in unmeasured forested watersheds.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2024-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.1002/rra.4295","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
Steep mountain environments are typically characterized by high sediment production. In the case of high hillslope–channel connectivity, high production and intensive transport of sediments are problematic and can cause damage in inhabited areas. At the end of the 19th century, due to flood events, large‐scale torrent control measures were inappropriately applied, disrupting the natural processes, and riparian and water ecosystems in watersheds. Connectivity in watersheds affects the course and magnitude of hazards that threaten human society. This is also why the topic of connectivity should be considered in the management of watercourses. Our study links the issue of sediment connectivity (lateral/longitudinal) and the sediment transport‐related risk in unmeasured forested watersheds Hučivá Desná and Upper Moravice. We applied a methodology for sediment transport‐related risk assessment and the well‐established effective catchment area (ECA) approach and connectivity index (IC) to two headwater streams. The results showed the parts of the streams with the highest degree of hazard related to sediment transport and sediment contribution areas connected to them. Based on the field survey, it was found that the best suitable threshold for ECA delineation for Hučivá Desná catchments is 8° and for Upper Moravice is 10°. Area of sediment contribution areas for Hučivá Desná is four times bigger than for Upper Moravice. The Hučiva Desná, therefore, has a higher potential sediment supply from the slopes, which also increases the possibility of occurrence of hazards associated with the sediment transport regime. All three applied methods confirmed that the parallel roads along channels decrease slope–channel connectivity, especially in the Upper Moravice catchment. The combination of methodologies created a suitable tool to identify the most problematic stretches of streams in terms of sediment connectivity and risk related to sediment transport, which can be useful for water and sediment management in unmeasured forested watersheds.
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.