Factors Influencing the Efficiency of Construction Projects in Jimma Zone, Jimma, Oromia, Ethiopia

Dubiwak Numera, Bulcha Assefa
{"title":"Factors Influencing the Efficiency of Construction Projects in Jimma Zone, Jimma, Oromia, Ethiopia","authors":"Dubiwak Numera, Bulcha Assefa","doi":"10.11648/j.larp.20240901.11","DOIUrl":null,"url":null,"abstract":"The construction sector plays a crucial role in the Ethiopian economy, making a substantial contribution to economic growth. However, various challenges have been identified as impacting the performance and growth of the Ethiopian construction industry. Projects in the Jimma Zone face numerous issues related to cost, time, and quality. This study aimed to evaluate how factors like resource management, stakeholder management, procurement management, and quality management influence project performance in the Jimma Zone. Data was collected through a structured questionnaire distributed to employees of Jimma Zone Employers and Contractors. A total of 62 questionnaires were distributed, with an 80.65% response rate, providing sufficient data for statistical analysis. Findings were presented using charts and tables. Quality management challenges included the absence of a quality management system and insufficient management commitment. Regression analysis indicated that resource and stakeholder management factors significantly influenced project cost and time performance, while quality management factors had a positive but not significant impact. Resource, stakeholder, and quality-related factors significantly influenced project quality performance, whereas procurement management factors did not have a significant impact. The study suggests that focusing on resource and stakeholder management could enhance project performance in the Jimma Zone.\n","PeriodicalId":399251,"journal":{"name":"Landscape Architecture and Regional Planning","volume":" 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Landscape Architecture and Regional Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/j.larp.20240901.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction sector plays a crucial role in the Ethiopian economy, making a substantial contribution to economic growth. However, various challenges have been identified as impacting the performance and growth of the Ethiopian construction industry. Projects in the Jimma Zone face numerous issues related to cost, time, and quality. This study aimed to evaluate how factors like resource management, stakeholder management, procurement management, and quality management influence project performance in the Jimma Zone. Data was collected through a structured questionnaire distributed to employees of Jimma Zone Employers and Contractors. A total of 62 questionnaires were distributed, with an 80.65% response rate, providing sufficient data for statistical analysis. Findings were presented using charts and tables. Quality management challenges included the absence of a quality management system and insufficient management commitment. Regression analysis indicated that resource and stakeholder management factors significantly influenced project cost and time performance, while quality management factors had a positive but not significant impact. Resource, stakeholder, and quality-related factors significantly influenced project quality performance, whereas procurement management factors did not have a significant impact. The study suggests that focusing on resource and stakeholder management could enhance project performance in the Jimma Zone.
影响埃塞俄比亚奥罗莫州吉姆马市吉姆马区建筑项目效率的因素
建筑业在埃塞俄比亚经济中发挥着至关重要的作用,为经济增长做出了巨大贡献。然而,埃塞俄比亚建筑业的业绩和增长受到各种挑战的影响。吉马区的项目面临着许多与成本、时间和质量有关的问题。本研究旨在评估资源管理、利益相关者管理、采购管理和质量管理等因素如何影响吉马区的项目绩效。数据是通过向吉马区雇主和承包商的员工发放结构化问卷收集的。共发放了 62 份问卷,回收率为 80.65%,为统计分析提供了充足的数据。调查结果以图表形式呈现。质量管理方面的挑战包括缺乏质量管理体系和管理层承诺不足。回归分析表明,资源和利益相关者管理因素对项目成本和时间绩效有显著影响,而质量管理因素有积极影响,但不显著。资源、利益相关者和质量相关因素对项目质量绩效有明显影响,而采购管理因素则没有明显影响。研究表明,注重资源和利益相关者管理可以提高吉马区的项目绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信