Exploration of the best time to obtain rock structure information on the palm face during tunnel construction

IF 0.7 4区 地球科学 Q4 GEOCHEMISTRY & GEOPHYSICS
Zhiqiang Yan, Feng Jiang, Peng He, Gang Wang, Zhenghu Ma, Chuanxin Yang, Weidong Han, Ruijie Zhao
{"title":"Exploration of the best time to obtain rock structure information on the palm face during tunnel construction","authors":"Zhiqiang Yan, Feng Jiang, Peng He, Gang Wang, Zhenghu Ma, Chuanxin Yang, Weidong Han, Ruijie Zhao","doi":"10.1007/s11770-024-1083-x","DOIUrl":null,"url":null,"abstract":"<p>Rapid acquisition of rock structure information during tunnel construction is crucial for optimizing subsequent construction strategies and avoiding engineering rock disasters. In this regard, this study proposes the best time to obtain rock structure information on the tunnel face during the construction period. By summarizing relevant studies on rock information acquisition locally and abroad and combining them with the actual situation during the construction of the Lushan Tunnel, this study analyzed the factors affecting the quality of rock information acquisition during the construction period and the approximate range of the optimal timing of acquisition. We also conducted experiments on the concentration of respiratory dust and the concentration of total dust on each section of the Lushan Tunnel construction site and explored the optimal timing of acquiring rock information on the tunnel face by conducting several dust experiments at the construction site. The results showed that the best time to obtain information was before the erection of the steel arch, which was also the best time for the engineers to conduct mechanical characterization of the tunnel face and the lining inspection of the tunnel. The optimal acquisition timing identified in this study is crucial for improving the accuracy of rock information acquisition and guiding subsequent construction programs.</p>","PeriodicalId":55500,"journal":{"name":"Applied Geophysics","volume":"26 1","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2024-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Geophysics","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.1007/s11770-024-1083-x","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"GEOCHEMISTRY & GEOPHYSICS","Score":null,"Total":0}
引用次数: 0

Abstract

Rapid acquisition of rock structure information during tunnel construction is crucial for optimizing subsequent construction strategies and avoiding engineering rock disasters. In this regard, this study proposes the best time to obtain rock structure information on the tunnel face during the construction period. By summarizing relevant studies on rock information acquisition locally and abroad and combining them with the actual situation during the construction of the Lushan Tunnel, this study analyzed the factors affecting the quality of rock information acquisition during the construction period and the approximate range of the optimal timing of acquisition. We also conducted experiments on the concentration of respiratory dust and the concentration of total dust on each section of the Lushan Tunnel construction site and explored the optimal timing of acquiring rock information on the tunnel face by conducting several dust experiments at the construction site. The results showed that the best time to obtain information was before the erection of the steel arch, which was also the best time for the engineers to conduct mechanical characterization of the tunnel face and the lining inspection of the tunnel. The optimal acquisition timing identified in this study is crucial for improving the accuracy of rock information acquisition and guiding subsequent construction programs.

探索隧道施工期间获取掌子面岩石结构信息的最佳时机
在隧道施工期间快速获取岩石结构信息对于优化后续施工策略和避免工程岩体灾害至关重要。为此,本研究提出了在施工期间获取隧道工作面岩石结构信息的最佳时机。本研究通过总结国内外岩石信息获取的相关研究,并结合庐山隧道施工过程中的实际情况,分析了影响施工期岩石信息获取质量的因素以及最佳获取时机的大致范围。我们还对庐山隧道施工现场各标段的呼吸性粉尘浓度和总粉尘浓度进行了实验,并通过在施工现场进行多次粉尘实验,探讨了隧道工作面岩石信息采集的最佳时机。结果表明,钢拱架架设前是获取信息的最佳时机,也是工程人员对隧道工作面进行力学表征和隧道衬砌检测的最佳时机。本研究确定的最佳采集时间对于提高岩石信息采集的准确性和指导后续施工计划至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Applied Geophysics
Applied Geophysics 地学-地球化学与地球物理
CiteScore
1.50
自引率
14.30%
发文量
912
审稿时长
2 months
期刊介绍: The journal is designed to provide an academic realm for a broad blend of academic and industry papers to promote rapid communication and exchange of ideas between Chinese and world-wide geophysicists. The publication covers the applications of geoscience, geophysics, and related disciplines in the fields of energy, resources, environment, disaster, engineering, information, military, and surveying.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信