Yousaf Ali, Muhammad Sabir, Muhammad Salman Hassan
{"title":"Risk Management in Railways Construction Investments: A Case Study of China-Pakistan Economic Corridor (CPEC) ML-1 Project","authors":"Yousaf Ali, Muhammad Sabir, Muhammad Salman Hassan","doi":"10.2478/ttj-2024-0014","DOIUrl":null,"url":null,"abstract":"\n Railway projects are incredibly costly due to their complex nature. This study performs risk analysis and management of Pakistan railways ML-1 project expansion and upgradation that will be undertaken at US$6.8 billion under the China-Pakistan Economic Corridor (CPEC). The risks were identified based on an extensive literature review and their relevance to the CPEC. We employed fuzzy set theory (integrated with the risk severity index) to obtain the most severe risks. The novelty of this study is the technique employed to analyse and rank the risk, also there are no previous studies conducted that emphasized the construction risk of railway projects in Pakistan. The study is useful for all stakeholders of the project, as it can plan for them to tackle these risks and implement ML-1 successfully.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2024-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/ttj-2024-0014","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
Railway projects are incredibly costly due to their complex nature. This study performs risk analysis and management of Pakistan railways ML-1 project expansion and upgradation that will be undertaken at US$6.8 billion under the China-Pakistan Economic Corridor (CPEC). The risks were identified based on an extensive literature review and their relevance to the CPEC. We employed fuzzy set theory (integrated with the risk severity index) to obtain the most severe risks. The novelty of this study is the technique employed to analyse and rank the risk, also there are no previous studies conducted that emphasized the construction risk of railway projects in Pakistan. The study is useful for all stakeholders of the project, as it can plan for them to tackle these risks and implement ML-1 successfully.
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.