COST ANALYSIS ON THE CONSTRUCTION OF SPORTS FACILITIES IN KEDEWAN SUB-DISTRICT, BOJONEGORO DISTRICT WITH EVM (EARNED VALUE METHOD)

Sanda Praja Riduwan, Budi Witjaksana, H. T. Tjendani
{"title":"COST ANALYSIS ON THE CONSTRUCTION OF SPORTS FACILITIES IN KEDEWAN SUB-DISTRICT, BOJONEGORO DISTRICT WITH EVM (EARNED VALUE METHOD)","authors":"Sanda Praja Riduwan, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v2i4.988","DOIUrl":null,"url":null,"abstract":"The implementation of construction work has the main targets in construction management, such as construction costs, quality of construction work and construction implementation time. Construction activities can be declared successful in their management if they produce work products with the quality criteria that have been determined, on time, and according to the agreed costs. Using EVM (Earned Value Method) in project management can be used to determine cost performance and implementation time during the project and the indicators used for analysis include: BCWP (Budget Cost of Work Performance), BCWS (Budget Cost of Work Schedule), ACWP (Actual Cost of Work Performance), SV (Schedule Variance), CV (Cost Variance), SPI (Schedule Performance Index), CPI (Cost Performance Index), EAS (Estimated At Schedule) and ETS (Estimated Temporary Schedule). By using this method in the Sports Facilities Construction Project, Kecamatan Kedewan, Kabupaten Bojonegoro, the ACWP (Actual Cost of Work Performed), BCWP (Budgeted Cost of Work Performed), and BCWS (Budgeted Cost of Scheduled) values were obtained. The CV value obtained <0 in weeks 1 to 7 indicates that the costs incurred were greater than the plan, but in weeks 8 to 15 the CV value >0 means that in that week the costs incurred were less than the plan. Meanwhile, meaning the project is experiencing a delay from plan. The estimated of the completion budget requirement obtained from the ETC (Estimate to Compile) value is Rp. 3,345,105,521.28, while the estimated final total project cost obtained from the EAC (Estimate at Complete) value is Rp. 5,680,868,593.22.","PeriodicalId":475177,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS)","volume":"44 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS)","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.55047/ijateis.v2i4.988","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The implementation of construction work has the main targets in construction management, such as construction costs, quality of construction work and construction implementation time. Construction activities can be declared successful in their management if they produce work products with the quality criteria that have been determined, on time, and according to the agreed costs. Using EVM (Earned Value Method) in project management can be used to determine cost performance and implementation time during the project and the indicators used for analysis include: BCWP (Budget Cost of Work Performance), BCWS (Budget Cost of Work Schedule), ACWP (Actual Cost of Work Performance), SV (Schedule Variance), CV (Cost Variance), SPI (Schedule Performance Index), CPI (Cost Performance Index), EAS (Estimated At Schedule) and ETS (Estimated Temporary Schedule). By using this method in the Sports Facilities Construction Project, Kecamatan Kedewan, Kabupaten Bojonegoro, the ACWP (Actual Cost of Work Performed), BCWP (Budgeted Cost of Work Performed), and BCWS (Budgeted Cost of Scheduled) values were obtained. The CV value obtained <0 in weeks 1 to 7 indicates that the costs incurred were greater than the plan, but in weeks 8 to 15 the CV value >0 means that in that week the costs incurred were less than the plan. Meanwhile, meaning the project is experiencing a delay from plan. The estimated of the completion budget requirement obtained from the ETC (Estimate to Compile) value is Rp. 3,345,105,521.28, while the estimated final total project cost obtained from the EAC (Estimate at Complete) value is Rp. 5,680,868,593.22.
采用挣值法(EVM)对博琼戈罗区 KEDEWAN 分区体育设施建设进行成本分析
建筑工程的实施在建筑管理中具有主要目标,如建筑成本、建筑工程质量和建筑实施时间。如果建筑活动能够按时、按约定的成本生产出符合既定质量标准的工程产品,就可以宣布其管理取得成功。在项目管理中使用挣值法(EVM)可用于确定项目期间的成本绩效和实施时间,用于分析的指标包括分析指标包括:BCWP(工作绩效预算成本)、BCWS(工作进度预算成本)、ACWP(工作绩效实际成本)、SV(进度差异)、CV(成本差异)、SPI(进度绩效指数)、CPI(成本绩效指数)、EAS(估计进度)和 ETS(估计临时进度)。通过在博约内戈罗省 Kecamatan Kedewan 体育设施建设项目中使用这种方法,得出了 ACWP(已完工程实际成本)、BCWP(已完工程预算成本)和 BCWS(已完工程预算计划成本)值。CV 值为 0 意味着该周发生的成本低于计划。同时,意味着项目比计划延迟。根据 ETC(估算编制)值估算出的完工预算需求为 3,345,105,560 印尼盾。3,345,105,521.28印尼盾,而根据 EAC(完工估算)值估算的最终项目总成本为 5,680,868,560 印尼盾。5,680,868,593.22.
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信